BOS 100 bench study: destruction of TCE

Dec. 7, 2010
0.511.522.533.544.55 (0 votes)

The TCE destruction chart shows a 99.95% reduction in the presence of TCE after 2 hours of contact with Trap & Treat® BOS 100®, and 99.99% reduction in tie presence of TCE after 6 days. (The numbers shown are in ppb.)

The graph on the right shows the actual destruction of TCE by measuring the chloride atoms released as TCE is broken down. The graph shows that over 50% of the original TCE mass has been completely degraded within a period of 6 days. Based on a mathematical model of this data, the TCE will be completely degraded in just over 19 days.

NEWS

RELATED PRODUCT

Trap & Treat - BOS 100 - Complete Remediation For Chlorinated Contamination Trap & Treat - BOS 100 - Complete Remediation For Chlorinated Contamination

Traditional iron treatment of chlorinated soil contamination is slow and risky. Trap & Treat BOS 100 achieves a faster and better result without further contaminating groundwater...in a simpler and more cost-effective process. No daughter products, no additional risk...in fact, BOS 100 requires no special safety controls or installed equipment! Trap & Treat BOS 100 has quickly become the premier In Situ Chemical Reduction (ISCR) product in ...

» Read more    » Contact now / Request quote


RELATED KEYWORDS

MOST POPULAR RELATED SEARCHES


Post a new comment

Post your comment

View comments

No comments were found for BOS 100 bench study: destruction of TCE. Be the first to comment!



Contact Us | Advertise | FAQs | Add Your Company | About Us | Terms | Privacy Policy | Company Sitemap | Category Sitemap | Professional Profiles Sitemap

Environmental Expert LinkedIn LinkedIn | Environmental Expert Twitter Twitter | Environmental Expert Facebook Facebook | RSS Feeds RSS | Environmental Expert Blog Blog

©1999-2012 Environmental Expert S.L.
Air & ClimateEnergy & RenewablesEnvironmental ManagementHealth & SafetyMonitoring & TestingSoil & GroundwaterWaste & RecyclingWater & Wastewater