Topics

Sections

waste treatment Equipment in Paraguay

212 Results found
Order by:
Recommended | 
Alphabetical

Incinerators For Hospital Waste

by Tecam Group

Tecam Group provides incinerators for hospital waste treatment. The equipment incineration capacity is based on two or three loads per day (8-10 hours) depending on the density and the PCI of the material to be incinerated, including the cooling time required for each unit. The atmospheric pollution control equipment is not included in the ...

Incinerators For Municipal Waste

by Tecam Group

Tecam Group provides incinerators for municipalities’ waste treatment.The equipment incineration capacity is based on two or three loads per day (8-10 hours) depending on the density and the PCI of the material to be incinerated, including the cooling time required for each unit.The atmospheric pollution control equipment is not included in the ...

Incinerators For Industrial Waste

by Tecam Group

Tecam Group provides incinerators for industrial waste treatment.The equipment incineration capacity is based on two or three loads per day (8-10 hours) depending on the density and the PCI of the material to be incinerated, including the cooling time required for each unit.The atmospheric pollution control equipment is not included in the ...

Materials Recovery Facilities (MRF)

by TAIM WESER

The supply of MRF turnkey systems and components for virtually any type of waste and recycling operation is one of our core business activities.Our competences include all available waste treatment technologies which we combine to economical and ecological highly efficient systems.

Gient - Mobile Medical Waste Treatment System

by Chongqing Gient Heating Industry Co., Ltd.

This mobile type of steam-based medical waste treatment system (a vehicular mobile device for the treatment of medical waste): all units and the facilities are equipped on a dedicated semitrailer, which can go to the medical waste location for disposal.

GORE™ Cover For Organic Waste Treatment

by W. L. Gore & Associates

Another environmental use for a special Gore laminate called GORE™ Cover is organic waste treatment. This System Technology, first put on the market in 1994, is increasing the throughput, accelerating the composting procedure and improving the quality of the degraded material, all at the same time as reliably retaining oders and microbes.

Waste Treatment Digesters

by Flexi-Liner Corporation

We work with construction companies and large municipalities that install liners to maintain large digesters for waste treatment. From the design phase through to completion, our expertise in providing the right material and installation procedures has made these projects successful.

Organic Waste Treatment Systems

by WT ENERGY S.p.A.

For the disposal of organic materials, WT ENERGY can develop a custom treatment facility that is both profitable for you and the environment.

Dry Waste Treatment Systems

by WT ENERGY S.p.A.

Instead of throwing your waste away, why not consider turning it into something more profitable?

VacuDry - NORM Waste Treatment

by econ industries GmbH

Typical input material for this type of plant is N.O.R.M. waste/sludge from the natural gas industry. This plant is specially designed for the treatment of mercury contaminated sludge including NORM radioactive natural gas. The plant is designed as a skid-mounted execution for on-site treatment. The prime aim of the thermal processing plant - ...

What is a Showcase?

Air & ClimateEnergy & RenewablesEnvironmental ManagementHealth & SafetyMonitoring & TestingSoil & GroundwaterWaste & RecyclingWater & Wastewater