Moulded Goods Production Lines – Safety Mats, Traffic Safety Products

0.511.522.533.544.55 (0 votes)
Moulded Goods Production Lines – Safety Mats, Traffic Safety Products

WIL implements complete plants for molded goods production lines, such as safety mats, traffic safety products, rail track lining, etc. The equipment will allow the operator to fabricate a wide range of products in simultaneous production cycles. Special care has been given to allow easy reconfiguration of the equipment to adapt to changing product needs.

 


DESCRIPTION: Complete turn-key solution for producing mats, bricks, etc.
INPUT: End-of-life tyre derived granulates, 1.0 mm - 4.0 mm
THROUGHPUT CAPACITY: 4,000 metric tons per year (3 shifts)
OUTPUT: A variety of mat and tile products
MANPOWER: 1 skilled foreman per shift 5 unskilled workers per shift (1 per press)
POWER REQUIREMENTS: 3 KW, 400 V
SITE REQUIREMENTS: Industrial Building with 3,000 m2 available floor space;8 m ceiling heightControlled temperature (18°C to 34°C)3,000 m2 covered storage area


EPC Solution and Service Package

EPC Solution and Service Package


Engineering, Procurement, and Construction (EPC) Contract award includes a complete package, including:

  • Market Study
  • Business Plan
  • Site Survey
  • Engineering Drawings
  • Equipment Delivery
  • Installation
  • Test-Operations
  • One month On the Job Training
  • Initial Sales Support (3 months)


Benefits

  • Industrial strength: optimized for high productivity, constant throughput
  • Highly adaptable to market conditions: very flexible for varying the mix of products
  • 10 years experience in re-engineering the equipment
  • Easy adaptation of additional molds for new products
  • Available product branding by WIL AG.

Warranties

After conclusion of Acceptance Testing the equipment is guaranteed to be free of defects and operate as specified. The warrantyperiod is 12 months from completion of Acceptance Testing, or 18 months from final delivery to the site, whichever comes sooner.

Delivery

The equipment will be ready for shipment 33 weeks after receipt of order and payment. Assembly, Installation, and Testing will beperformed within 4 weeks from the arrival of the equipment at the site.


WIL AG
WIL AG
Neubaugasse 4 / 7-9
Vienna 1070
DOWNLOADS

DOWNLOADS


RELATED KEYWORDS

MOST POPULAR RELATED SEARCHES

Post a new comment

Post your comment

View comments

No comments were found for Moulded Goods Production Lines – Safety Mats, Traffic Safety Products. Be the first to comment!



Contact Us | Advertise | FAQs | Add Your Company | About Us | Terms | Privacy Policy | Company Sitemap | Category Sitemap | Professional Profiles Sitemap

Environmental Expert LinkedIn LinkedIn | Environmental Expert Twitter Twitter | Environmental Expert Facebook Facebook | RSS Feeds RSS | Environmental Expert Blog Blog

©1999-2012 Environmental Expert S.L.
Air & ClimateEnergy & RenewablesEnvironmental ManagementHealth & SafetyMonitoring & TestingSoil & GroundwaterWaste & RecyclingWater & Wastewater