hand augers Equipment in Oregon

6 Results found
  • Category: Soil & Groundwater ×

  • Subcategory: Groundwater Monitoring ×

  • Keyword: hand augers ×

  • Location: USA ×

  • Location: Oregon ×

Hand Augers

by US Environmental Rental Corporation

We have various bucket diameters and extensions in stock. Rental rates may apply for additional extensions. Please call for availability. The AMS regular soil auger is commonly used for obtaining disturbed soil samples at or near the surface and for boring to depths where soil samples may be obtained with a separate soil sampler or soil core ...

Model CS Series - Dirt Augers

by Pengo Attachments, inc

For hole digging in favorable to moderate soil conditions with one or two man auger drives.

Utility Augers

by My-D Han-D Mfg. Co. Inc.

My-D Han-D utility augers come in handy on so many occasions: at bins, in the feedlot. around the dairy barn, at feedmills and elevators. Move them where they're needed or permanently install them in your storage or grain drying operation. The 4-inch model can easily be carried from location to location. Operates horizontally, or at any angle. ...

Soil Sampling Kits & Hand Auger Equipment

by Geotechnical Services, Inc

Auger/sampler kits are designed for collecting environmental and geotechnical soil samples. The auger allows for digging a hole down to the desired sampling depth. A brass or stainless steel tube or ring is placed in the sampler and then driven into the ground with a slide hammer. We also supply the plastic caps, silicon tape and PTFE tape for ...

Model 0195 - Soil Column Cylinder Auger

by Soilmoisture Equipment Corp.

Soil Column Cylinder Auger, 1 Meter length, 90 mm ID, Complete Kit - includes, among other things, a gas-driven mechanical hammer, a stainless steel column cylinder, a hand auger, an extraction system and sample gutters. 

Surveying Set for Shallow Wells

by Eijkelkamp Agrisearch Equipment

Eijkelkamp Agrisearch Equipment has developed a survey drilling set for site investigations (to find the best place for the construction of a well). Survey drilling is started with the 10 cm auger. If the borehole collapses, which may happen below groundwater level, the casing tubes with steel screw thread sockets are lowered into the borehole and ...

Need help finding the right suppliers?

Let the XPRTs do the work for you