by
Neopoxy International
Inspection: The structure to be rehabilitated must be completely inspected and prepared, as needed,prior to applying NPR-3501 Flexible Epoxy System. Inorganic Surfaces: Once the inspection has been completed any active infiltration must be stopped and the surfaces thoroughly cleaned. Large surface defects, if present, are to be filled with resin ...