Showing results for: flue gas moisture Articles
-
Case study - Jämtlands Värme, Strömsund
The boiler for Jämtlands Värme in Stromsund was built in 1987. The old flue gas condenser, from another supplier, began leaking and needed to be replaced. Boiler: 10 MW Fuel: Bio fuels Condensor effect: 2 MW The boiler in Strömsund was built in 1987 and in 1994 it was equipped with a flue gas condensor with moisturizer to achieve maximum effect from the fuel. The Air Pollution ...
-
Precipitator Solves Dryer Problem
Plum Creek Manufacturing, Columbia Falls, Montana, installed a PPC Industries electrostatic precipitator to solve a direct fired dryer dust plugging problem. The electrostatic precipitator was installed in a very congested area and the project had to be done so the dryer was off-line a minimal amount of time. Plum Creek personnel relocated existing equipment, poured concrete footings, ran all of ...
-
Introduction to complete process technology of municipal sludge drying and carbonization
Introduction to complete process technology of municipal sludge drying and carbonization Abstract: This paper introduces the continuous thermal drying coupled with anaerobic pyrolysis process of sludge in detail, and analyzes the 300t / D sludge drying and carbonization treatment project in Jimo District, Qingdao. Sludge thermal drying and carbonization technology has the advantages of complete ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you