Active Refinery Remediation

Waste Management Unit (WMU) closures at this active refinery Waste Management Unit (WMU) closures at this active refinery - Installation of several soil, Liquid Boot, and full multi-layer geocomposite cover systems in various facility locations- - Sensitive construction practices including large scale activities near power lines, 30 inch raw water line, and several active emergency flares - Completed performance based in-situ solidification/stabilization, cap and closure, using ENTACT owned large diameter auger Delmag rig and custom-fabricated Geodrill - COC`s include heavy metals, PAH, volatile organic compounds, and petroleum hydrocarbons Performance criteria include an unconfined compressive strength of 10 psi, permeability coefficient of less than 2.1x10-6 cm/sec, and an admixture pH of less than 11.5 - ENTACT performed in-house treatability analysis to develop reagent admixture