NIVUS GmbH

Channel Networks - Fix Installation Measurements for no shutting down the flow areas - Water and Wastewater

The need to replace the existing Time of Flight without shutting down the flow. 4m deep channel. Application required to be installed in just 1 day.

  • To be able to measure Flow without shutting down the works.

Image
  • A measurement system Type OCM Pro has been used.
  • Rather than mounting the Sensor on the floor of the channel we used a Catamaran boat system and mounted the sensor to look top down into the channel.