Only show results available in Virginia? Ok

residential wind Applications

  • Wind Farm Noise Assessment by XL2

    One of the largest acoustic consulting firms in Australia was engaged by the New South Wales Department of Planning & Industry to conduct wind farm noise assessments. The goal was to perform a specialist, independent acoustic compliance audit of three major wind farms located near Canberra, Australia’s capital city. The objective of the study was to conduct a detailed noise assessment at residential dwellings near to the wind farms. Three wind farms near Canberra, Australia, were investigated. XL2 Sound Level Meters were operated on a continuous basis, typically over a six week period at each wind farm. The XL2 was battery powered to enable continuous noise logging for two weeks at a time at each residential site. The recorded data was then processed in accordance with the relevant standards specified in the conditions of consent for wind farms.

    By NTi Audio AG based in Schaan, LIECHTENSTEIN.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you