Only show results available in Virginia? Ok

water pipeline construction Applications

  • Premium

    Geotextiles solutions for pipeline construction areas

    The world registers less than 3.5 million kms of pipelines in 120 countries. Pipelines conveying flammable or explosive material, such as natural gas or oil, pose special safety concerns. To avoid pipeline instability and damage caused by differential settlements, TenCate Geosynthetics EMEA offers you the optimum solution from its wide range of reinforcement geosynthetics: TenCate Geolon PET & PP, TenCate Miragrid GX & TenCate Rock PEC ranges.

    By TenCate Geosynthetics Netherlands bv based in AE in Nijverdal, NETHERLANDS.

  • Premium

    Ultraviolet disinfection systems for the pipeline hydrotesting & flooding water

    Before natural gas or oil is transported through new pipelines, the entire length of the pipeline assembly is pressure tested using either fresh water or seawater, and is the final construction ‘quality assurance’ test before the pipeline is put into operation.  The pressure test is held for a specific amount of time, from between 1 day and 100 days, to ensure structural integrity before the pipeline is placed into operation.

    By atg UV Technology based in Wigan, UNITED KINGDOM.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you