Only show results available in Virginia? Ok

wind site assessment Applications

  • Ammonit Wind Ressource Assessment Systems

    Prior to setting up a wind farm, the local wind conditions have to be measured for site assessment. The construction of a profitable wind farm demand the most accurate and reliable wind measurement technology. The installed equipment has to perform as precisely as possible as the data quality is essential for designing a reliable and economical wind farm. A small discrepancy in the evaluation of wind speed data drastically multiplies the discrepancy of the calculated wind power. Wind resource assessment systems offered by Ammonit meet the highest standards of quality and are designed for the local site conditions with regard to sensor performance, communication system and power supply.

    By Ammonit Measurement GmbH based in Berlin, GERMANY.

  • Ammonit Wind Resource Assessment in Cold Climates

    For wind resource assessment campaigns in regions with long and cold winters, special measurement systems have to be designed. The challenges of cold climate regions should never be underestimated. Particularly icing is a problem. The met mast construction and the installed sensors have to be chosen carefully. The instruments have to be properly heated by a reliable power system. With our long-term experience in wind measurement and our local installation partners we can offer complete measurement systems robust enough for harsh and cold climates. Ammonit offers standard heating systems as well as individual heating solutions, which combine several power sources suitable for the site.

    By Ammonit Measurement GmbH based in Berlin, GERMANY.

  • Wind Farm Noise Assessment by XL2

    One of the largest acoustic consulting firms in Australia was engaged by the New South Wales Department of Planning & Industry to conduct wind farm noise assessments. The goal was to perform a specialist, independent acoustic compliance audit of three major wind farms located near Canberra, Australia’s capital city. The objective of the study was to conduct a detailed noise assessment at residential dwellings near to the wind farms. Three wind farms near Canberra, Australia, were investigated. XL2 Sound Level Meters were operated on a continuous basis, typically over a six week period at each wind farm. The XL2 was battery powered to enable continuous noise logging for two weeks at a time at each residential site. The recorded data was then processed in accordance with the relevant standards specified in the conditions of consent for wind farms.

    By NTi Audio AG based in Schaan, LIECHTENSTEIN.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you