GEA ENGINEERING

2001 Miniscgongo creek stream repair / environmental restoration - 8 projects Haverstraw, New York

0

Courtesy of GEA ENGINEERING

GEA conducted hydraulic studies and analysis as well as preparation of engineering plans, specifications, and bid documents for stream rehabilitation, environmental restoration, bank stabilization and channel improvements of the Minisceongo Creek in Haverstraw, New York for Rockland County Drainage Agency. The project known as Contract 2 encompassed designs for eight (8) sites including:·

  • Site 3 - Route 9W West· 
  • Site 4 - Bridge Street· 
  • Site 5 - Langschur Court· 
  • Site 1 - Samsondale Avenue· 
  • Site 2 - Hornick Avenue· 
  • Site 3C - Robbins Court North· 
  • Site 4C - Robbins Court South
  • Site 28 - Rella Court Embankment Repairs & Sewer Line Replacement· 

Each design was conducted as a FEMA funded project in response to damages caused by Tropical Storm Floyd.

The designs included excavation and removal of sediment and debris deposited from Tropical Storm Floyd. In addition, store filling and replacement of rip rap was designed for channel linings and stream embankments. Work included removal of debris with cranes (Bridge Street) and replacement of sewer lines and manholes at Rella Court.

Bank restoration included controlled structural filling, rip rap placement, vegetation and slope stabilization with geosynthetic turf mats and geotextiles.  All projects were conducted using US Army Corps of Engineers Nationwide Permits and NYS Department of Environmental Conservation joint water quality certification permits.