A weekly operational planning model for a run-off-the-river system: some simulation results from the Tambiraparani river, Tamil Nadu, India
In the present study, a weekly operational planning model has been developed using a simulation technique for the Tambiraparani river system in Tamil Nadu, India. A planning model has been developed incorporating the important features of the existing operational policy. Paddy is the main crop cultivated in three seasons, although banana is cultivated to an appreciable extent, it has not been recognized in the existing operational policy. The major task of the water resources manager is to find the area under paddy during the third season namely, the
Keywords: Planning model, Run-off-the-river, Simulation, Tambiraparani river system, Temporal distribution, Water loss/gain
-
Most popular related searches
Customer comments
No comments were found for A weekly operational planning model for a run-off-the-river system: some simulation results from the Tambiraparani river, Tamil Nadu, India. Be the first to comment!