Aggregrate Industry Wastewater Success

0
- By:

Courtesy of Integrated Engineers Inc.

Aggregrate Industry Wastewater Success

Floccin™ 1105 Facilitates Wastewater Reuse

This facility manufactures crushed rock and DOT approved road base for several state highway and airport expansions.

The facility neglected to install a soils entrainment and control plan or system and is in violation of their discharge permit. Integrated Engineers was requested to evaluate the site and make recommendations and a proposed system to mitigate this surface water runoff problem.

The sample from this aggregate operation was jar tested onsite with Floccin™ 1105. With minimal mixing (less than 30 seconds), the solids were agglomerated into a quick settling Floc as shown below.

Part of the proposed 500 gpm system was to utilize this water and reuse 100% of it in their rock washing operations. The dosage was 0.25 grams/1,000 ml.

Aggregate Industry Wastewater Treatability Test Before & After Treatment

 

Click to Download pdf of this Aggregate Industry Case Study...