American Electric Power Service Corp., Clinch River Power Plant, Cleveland, Virginia U.S.A.: Accelator® Solids Contact unit and Greenleaf Filter Control

0
Problem

Combined wastewater streams from ash tank overflow, boiler room sumps, cooling tower blowdown, seal and cooling water, and various plant drains exceeded current discharge limits for copper. The owner anticipated new NPDES permit limits to be further reduced to 9.3 ppb Copper. TSS reduction was also required.

Customer comments

No comments were found for American Electric Power Service Corp., Clinch River Power Plant, Cleveland, Virginia U.S.A.: Accelator® Solids Contact unit and Greenleaf Filter Control. Be the first to comment!