ArmorMax® Chosen in Milltown reservoir diversion channel stabilization project for state of Montana case study

0

Courtesy of Propex Operating Company, LLC

PROJECT SUMMARY Over 100 years of deposited mine tailings prompted the Montana DEQ and U.S. EPA to embark on a major initiative to breach the Milltown Reservoir Dam and clean up contaminated sediments. But maintaining the flow of the Blackfoot and Clark Fork Rivers called for a potentially expensive diversion channel. Incorporating the AR-MORMAX® ARVS in the upper cross section to protect against the highest design flows minimized expensive gabion mattresses for use only in the low flow channel section. The result was over $1.1 million in savings, and a significant time and labor reduction.

ARMORMAX® FEATURES & BENEFITS:

  • High Performance TRM Channel Linin;
  • Superior hydraulic performance in an unvegetated condition
  • Easy and rapid installation
  • Cost-saving, value-engineered solution Proven technology, sustainable results

Customer comments

No comments were found for ArmorMax® Chosen in Milltown reservoir diversion channel stabilization project for state of Montana case study. Be the first to comment!