Project Name: Arrowhead Lake Comm. Assoc. Waste Water Treatment Rehabilitation

Product: Rainstore3 and Draincore2 

Application: Drainage System

City: Pocono Lake

State/Province: Pennsylvania

Install Date: March 2003

Install Size: 285 m2 (3000 sq ft) Draincore2 and 1526 units of Rainstore3

Address: Lehigh Rd & Orono Drive

Client: Arrowhead Sewer

Designer: Princeton Hydro, LLC

Contractor: Hartman Contracting and Arrowhead Lake Comm. Assoc.

Directions: Lehigh Rd. & Orono Drive

Location: Surrounding and under equalization tank.

Photography: Princeton Hydro, LLC 2203

Summary: Arrowhead Sewer Company, Inc. hired Princeton Hydro, LLC to provide engineering services to reinstall an inflow Equalization Tank that floated due to unforeseen groundwater conditions. Given site and layout restrictions, Princeton Hydro designed groundwater and overland flow control elements to buffer the tank from groundwater uplift. The system consisted of two main parts: a diversion channel to direct the overland flow around the tank area, and a subsurface drainage system around the tank. The drainage system consisted of Invisible Structure’s Rainstore3, surrounding the tank with a curtain composed of 94 percent voids, and Draincore2 under the tank, both capturing and conveying water to a 30” outlet pipe. Princeton Hydro also designed an anchor system to fasten the EQ tank to the existing concrete pad.

Rainstore3 cells are placed in the excavated area. Princeton Hydro, LLC used varying heights of cells – see image schematic below.