Butane overhead condenser returned to original operating efficiency case study

0

Courtesy of Apex Engineering Products Corporation

A Canadian energy company had fouling issues with cooling water at one of its plants that caused severe scaling in a butane overhead condenser. A 50% RYDLYME solution was recommended to dissolve the accumulated scale within the condenser.

RYDLYME approach
330 gallons circulated for 6 hours at ambient temperature, reversing flow every half hour using a pumper truck.

RYDLYME results
Complete removal of the scale and the cooling duty returned to same efficiency as when new!