AirProtekt Limited

Case Study for Tape Coating Industry


Courtesy of Courtesy of AirProtekt Limited

The three bed RTO & process ductwork system including bypass valves and stacks. The whole operation including dismantling & disposal of two existing thermal oxidiser, installation of over 100m of fabricated ductwork, valve and bypass stacks, then assembly & start up of new turn key system took four weeks. Significant savings were achieved on running costs and maintenance.