Case study - port construction

0

Courtesy of Dragflow North America

Location: Georgia
Year: 2011

Working context

The project consiste in the widening and cleaning of a commercial harbor in Georgia

The Problem

Find a very flexible equipment able to work with working depth up to 15m and discharge distance from 200mm and 600m

Our Solution

Dragflow Dredge DRH85/160E22DF: a full optional dredge with 2 dredging unit. The first dredging unit on bord of the dredge to work in the main area of the new harbor and a second unit, mounted on an excavator, to work on the shore.

Customer comments

No comments were found for Case study - port construction. Be the first to comment!