Case study - railroad release prevention barrier

0

Courtesy of Total Containment Solutions Inc.

Location: Walnut Hill, FL.

System Applied: RobolLiner
Substrate / Area: Gravel / 51,596 sq ft
Date Completed: July 2012

Project Description

The railroad needed containment for when they were unloading crude. We installed our RoboLiner System right on top of the sharp gravel and now they have a seamless spill prevention area. The liner is approximately 15’ wide at the widest point and runs along the railroad for nearly a mile.