This manufacturer was having difficulty with their wastewater containing high levels of TDS, increasing costs, and corrosion of their waste water equipment and building. The operation treats 20,000 gallons/day of a combination of starch and glues wash down water from the central manufacturing plant. The wastewater is equalized for flow in a 60,000 gallon EQ Tank and treated in 10,000 gallon batches.