Industrial Wastewater Treatment Case Study

Class A Industrial Wastewater Treatment Plant

Settling Time Reduced From Twelve Hours to 30 minutes!

This facility receives and treats oily wastewater from industrial clients. The water is treated with an initial oil/water separator, collected in a reaction tank where Floccin-J is used at a dosage of 325 lbs/18,000 gallons, then dewatered using a filter press. The results of the preliminary tests with just Floccin-J are shown below:

General Analysis (units in mg/L)

BOD 14,100 5,190 63.2%
TDS 3,600 3,650 Negligible