Coopervision - Case Study


Courtesy of Courtesy of Modulek

Client: Coopervision

Completed: Nov 2015

Floor Area: 90m2

Duration: 2 Weeks

Value: £150,000.00

Turnkey service elements completed:

  • Foundation Design
  • Manufacture
  • Delivery
  • Installation
  • Commissioning

This exciting project was a vivid demonstration of Modulek’s ability to truly be innovative in their design, providing a state of the art gatehouse building here for a high profile client operating a very busy site.

The client had an initial outline scheme using a traditional construction method,that was considered the only route to go to achieve the type of appearance desired with curved walls and roof detail, which was essential to create the right impression at the entrance of such a prestige site.

Modulek were able to offer the ultimate solution for the client whereby the same aspiration of design could be produce with the Modulek system saving weeks on end of disruptive building works at the entrance of the busy site – had it been a traditional construction method.

The client was saved from what would have been an almost certain factory closure for several days had the traditional construction method have been used and disabled the critical security access point for a inconvenient period of time which would have cost the company a substantial of money in down time.

Modulek offers true value for money with speed and convenience that saves you more money than just on the building itself!