Polishing of a MTBE Hot Zone in Low Permeability Artificial Fill after Pump & Treat

SITE SUMMARY

  • Pump/treat system operated for 3 years.
  • Groundwater in isolated portions of the site remained significantly above cleanup levels for MTBE.
  • 2 iSOC ® s used for 1 year upgradient of MW-2 and sidegradient and slightly downgradient of MW-1.
  • MTBE levels were drastically reduced at MW-1 and MW-2: cleanup criteria were met. iSOC ® system removed.
  • Site is in post-remediation monitoring.