Thermal Remediation Services, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene (TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was applied, whichever occurred first. The remedial goal was to reduce TCE concentrations in soil to 0.1 mg/kg for a reduction of approximately 99%. The goal was achieved with an average reduction of 99.5% of TCE in soil, with 13 of the 14 samples measuring non-detect.