Global Environmental Engineering

Environmental Assessment Brownfield Study


Courtesy of Courtesy of Global Environmental Engineering

In late 2011, Global was contracted by the Genesee County Land Bank and City of Flint to prepare an Environmental Assessment (EA) in accordance with guidelines set for by the U.S. Department of Housing and Urban Development (HUD) 24 CFR Part 58 for the Smith Village Project. Global utilized the HUD recommended format during the preparation of the EA including completion of the Statutory Checklist and Environmental Assessment Checklist. As part of the EA process, Global completed several Phase I ESA, Phase II ESA, and Soil Vapor Surveys on properties throughout the Smith Village area at. In addition Global completed a Due Care Plan approved by the Michigan Department of Environmental Quality (MDEQ). Evaluated environmental conditions of residential and commercial structures. Communicated between regulatory agencies and GCLBA. Asbestos inspections completed to residential/commercial structures. Includes  sampling  and identifying hazardous materials.

Customer comments

No comments were found for Environmental Assessment Brownfield Study. Be the first to comment!