Environmental incident response, North-East England

0

Courtesy of Remediation Strategies Ltd.

Project

Remediation Strategies were requested to attend a manufacturing facility in North-East England following an overnight fire at the site. Fire-fighting operations and the site sprinkler system had created a large volume of contaminated run-off together with widespread flooding across the shop floor area of the manufacturing facility.

Productivity was stopped across the entire site and Remediation Strategies were requested to provide assistance with pumping out of firewater, ensuring no surface water impact occurred, correctly stockpiling waste water for disposal and co-ordinating sub-contractors on site.

Work Scope

Remediation Strategies were able to provide a full incident response as a UK Spill Accredited Contractor. The following specific response actions were completed:

  • A response team and equipment were mobilised to site within 2 hours of call-out.
  • Containment measures were implemented to prevent any impact of the site surface water drainage system.
  • Portable pumps were set up within the shop floor area to remove contaminated firewater run-off for disposal.
  • Assistance was provided to other sub-contractors conducting deep cleaning and plant decontamination works.
  • Response team remained on-site for 13 hours until all firewater and wash-water was effectively removed and stockpiled for disposal.
  • Remediation Strategies returned to site to ensure all ducts and underground chambers were confirmed to be free from firewater; and.
  • Appropriately licensed sub-contractors were selected and the waste disposal operations managed by Remediation Strategies.

Summary

Remediation Strategies attended a  manufacturing facility in North-East England following an overnight fire. The Response Team were able to pump out and stockpile contaminated firewater from the shop floor prior to disposal off-site. Containment measures to protect controlled waters were also installed at the site. Remediation Strategies maintained a continuous presence on site until all contaminated firewater was removed and assisted the facility in returning to production at the earliest opportunity.

Testimonial

The Site Health, Safety and Environmental Manager provided the following comments on the services provided by Remediation Strategies:

‘Thanks once again for the efforts made & results achieved – it has enabled us to recommence production much earlier than we thought possible.’

Customer comments

No comments were found for Environmental incident response, North-East England. Be the first to comment!