- Home
- Companies
- Presto Geosystems
- Articles
- Flexible transition Mat/TRM system ...
Flexible transition Mat/TRM system protects Stormwater Channel Embankments - Case Study
Courtesy of Presto Geosystems
City’s Relocation and Floodplain Management Project Included Embankment Protection at Culvert Outflows
The GEORUNNER flow protection mat system, manufactured by local Appleton company, Presto Products Company, was employed as additional embankment stability on the channel alignment project.
The Apple Creek Relocation and Floodplain Management Project includes re-aligning approximately 5,000 feet of channel, creation of wetland depressional areas and a floodplain storage area, and the placement of three waterway crossing structures and one bridge. The disturbed lands will be re-vegetated, and the new channel embankments protected with a TRM and GeoRunner mat system at high impact locations and planted with native vegetation.
AECOM Technical Services, Inc. designed the re-aligned channel to create a meandering, naturalized water feature. The modifications included an 8‑foot bottom flow line width for low-flows along the new alignment. The low-flow channel includes riffle-pool complexes installed at appropriate locations for a more naturalized channel. The upper portion of the corridor was excavated to create floodplain storage at the bank-full elevation.
-
Most popular related searches
Customer comments
No comments were found for Flexible transition Mat/TRM system protects Stormwater Channel Embankments - Case Study. Be the first to comment!