Groundwater Monitoring Case Study

0

Courtesy of Global Environmental Engineering

Global has been contracted by the Michigan Department of Environmental Quality, Remediation and Redevelopment Division (MDEQ RRD) to conduct quarterly sampling at a former gas station and adjacent property located near a State of Michigan owned public assess site to Torch Lake. The purpose of the sampling is to assure that there are no impacts to the surface water located downgradient of the
former underground storage tanks or to the drinking water. Additionally, Global will determine if the contaminant plume is naturally degrading.

During the course of monitoring, Global prepares quarterly reports detailing an ongoing assessment of the contaminant  plume’s condition/characteristics and provides details for dditional corrective actions that may be required to  address immediate impacts or threats. At the end of the monitoring, Global will make recommendations if further monitoring and study is required, if corrective actions are necessary, or if no further actions are required.

Customer comments

No comments were found for Groundwater Monitoring Case Study. Be the first to comment!