Guangdong Yangxi Power Plant Desulfurization Wastewater Treatment Project
Processing scale: 48 tons/hour
Treatment process: DTRO + STRO
Project features: The project adopts DT&ST integrated high-density concentration process, with less concentrate production, low operating cost, investment cost 15% lower than the full DTRO process, and high system reliability.
Jiarong- headquartered in Xiamen, China- was founded in 2005. We are a specialist in industrial membrane separation process. The core technology of Jiarong includes Disk-tube RO membrane system, Spiral-tube RO membrane system, Tubular UF membrane system and Micro-tube NF/RO membrane system etc. The main application fields cover leachate treatment, difficult wastewater treatment, flue gas desulfurization and coal chemical wastewater ZLD.
-