Kee Safety, Inc.

Handrail Addition: Post-Construction - Case Study

0

Courtesy of Kee Safety, Inc.

Problem:

Though when constructed, the ramp was not intended for use by individuals, regulations stipulated that a handrail must be available.

Solution:

Kee Klamp Type 70-7 was used to mount galvanized tubular handrail to the existing barrier without having attain a hot-work permit.

Customer comments

No comments were found for Handrail Addition: Post-Construction - Case Study. Be the first to comment!