Heavy scale on tower fill at luxury hotel gone in less than 1 hour case study

0

Courtesy of Apex Engineering Products Corporation

The cooling tower at one of Downtown Chicago’s luxury hotels was experiencing reduced airflow due to scale accumulation on the exterior surfaces of the tower fill. In addition to the reduced tower performance, the visible scale accumulation was aesthetically displeasing to the tower maintenance personnel. 

RYDALL CC  approach
5 gallons diluted (2:1) and foamed onto the exterior of the tower fill for approximately 20 minutes and rinsed off with water.
Overall cleaning time was 1 hour!

RYDALL CC results

  • Most of the scaling was dissolved and resulted in immediate airflow and improved aesthetics.
  • Customer scheduled a comprehensive cleaning utilizing our RYDLYME biodegradable descaler to remove scale from the tower interior and RYDALL CC  to return the exterior surfaces to like new condition!

Customer comments

No comments were found for Heavy scale on tower fill at luxury hotel gone in less than 1 hour case study. Be the first to comment!