ECA Geophysics

Integrated Geophysics: EMI and ReMi surveys at a hazardous waste landfill

0

Courtesy of ECA Geophysics

PROJECT: EMI and ReMi surveys at a closed hazardous waste disposal site
LOCATION: The Dalles, Oregon
PROJECT DESCRIPTION: Designed and performed a 5-ft spaced EMI survey in tandem with ReMi surveys at a closed 8-acre waste disposal site. The goals of this integrated geophysical investigation were to 1) detect landfill boundaries, 2) identify locations of buried metallic debris / drums and 3) to determine the depth to competent (non-rippable) basalt bedrock. All three goals were successfully achieved!

Customer comments

No comments were found for Integrated Geophysics: EMI and ReMi surveys at a hazardous waste landfill. Be the first to comment!