IX heavy metal removal from 35% MgCl2 - Russia, 900 m3/d - Case Study
Project Description:
Lenntech has been awarded a contract for the engineering, manufacturing and assembly for a heavy metal removal ion exchange system, mainly iron should be removed. The system is installed in the Russian Federation. The treated 35% Magnesium Chloride solution is used for the production of chemicals. The water desalination system is equipped withtop brand instrumentation and equipment. The system is completely from European origin and will be delivered with acertificate of origin.
Scope of Work:
- Engineering, manufacturing and assembly
- Chemical dosing stations
- Cartridge filtration
- Anionic ion exchange resin column
- Cationic ion exchange resin column
- Chemical regeneration systems
- Automated flush
- PLC controlled
- Site commissioning
Project duration:
February 2015 to November 2015
Project location:
Russian Federation
Product quality:
Fe < 4 . 10-5 M%
Project application:
Production of chemicals
Typical contract amount:
200.000 – 500.000 EUR