absorbent mat Articles
-
Secondary Oil Containment at US Army Corps of Engineers - Big Bend Dam - Case Study
Big Bend Dam takes its name from the unique bend in the Missouri River seven miles upstream from the dam. Construction of the dam began in 1959 and the embankment was completed in July 1963. Big Bend dam is 95 feet (29 m) high and 10,570 feet (3,220 m) in length. Power generation began at the facility in 1964 and the entire complex was completed by 1966. The hydroelectric plant generates 493,300 ...
-
Tyre Recycling is no news in the Emirates - Case Study
Recycling areas: Tyre Company name: Sharjah National Crumb Rubber Industries Located: Sharajh - Sajaa, United Arab Emirates Founded: 2004 Employees: 28 Sharjah National Crumb Rubber Industries is a tyre recycler in the United Arab Emirates. They see that waste tyres will be a large problem in the United Arab Emirates in the future, and they turn this pile of waste into a reusable ...
-
A chief executive’s perspective on a bright future for the lead battery industry
Q&A with Mark Wallace, President and CEO of Clarios This year’s 17th Annual European Lead Battery Conference & Exhibition was conducted virtually, but that didn’t diminish the calibre of insight. It included a presentation by Mark Wallace, the new president and CEO of Clarios. In a Q&A format, Battery Council International recapped Mark’s talk on the bright future ...
-
Solving waste oil management and removal problems in power generating plants
If your plant is like most, it is doing a good job of preventing oily water waste and waste oils from escaping into the environment. But at what cost? As labor resources dwindle, operating and maintaining drainage systems, oil separators, and sometimes inadequate oil removal equipment is expensive. Paying higher than needed costs for waste oil disposal, filtration and water treatment due to ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you