asbestos assessments Articles

  • The Phase 1 Environmental Assessment

    In today’s world where every property is subject to potential environmental risks a Phase 1 Environmental Site Assessment or ESA is an appropriate action to take. An ESA can help determine if the property has been contaminated by previous or current activities. The ESA can help protect the purchaser of a property from environmental risks prior to the closing on a property.  Lenders ...

  • The Asbestos Management and Maintenance Program

    STEP ONE: ASSESSMENT AND SURVEYThe first step of the Asbestos Management Program is to do an asbestos survey to assess the location, identify the type of asbestos, the condition of the asbestos and identify a maintenance record. This asbestos inventory or assessment is usually carried out by an independent consulting firm. This assessment or survey will include: Identification and location of the ...


  • Protecting Workers From Asbestos

    However, repair, renovation, and demolition operations often generate airborne asbestos, a mineral fiber that can cause chronic lung disease or cancer. The Occupational Safety and Health Administration (OSHA) has developed regulations designed to protect cleanup workers from asbestos hazards. OSHA’s Standards for Asbestos The work of flood cleanup personnel involves the repair, renovation, ...

  • Asbestos in the Home and School

    This section discusses the presence of asbestos in houses, rental apartments, schools and other public buildings, and has a list of useful EPA contacts.   Does Your House Contain Asbestos? ...

  • Asbestos: A final chapter?

    In mid-June, U.S. Bankruptcy Judge Judith Fitzgerald of the Western District of Pennsylvania in Pittsburgh is scheduled to convene her court and hold confirmation hearings on a complex, $1 billion reorganization plan for Federal-Mogul Corp., the ...

  • Asbestos contaminated soil case study

    An active gypsum manufacturing facility discovered they had a large area of gypsum waste containing asbestos mixed with soil at the back of their property. The waste had accumulated over the years before the dangers of asbestos were known and now required remediation due to communication wires buried in the waste. Excavators could not be used due to the presence of the communication wires that ...


    By Enviro-Vac Corp.

  • Asbestos management goes digital - Mobile solutions for asbestos tracking

    Compliance with new regulations is nearly impossible using only paper-based systems, especially for owners of large numbers of buildings. A critical component of any asbestos management strategy is the effective application of technology – but selection and implementation of systems can mean a large investment of both time and money. The objective of this article is to provide an explanation of ...


    By Basebridge.com Limited

  • The Investigation, Assessment and Design of a Rehabilitation Solution Following the Failure of an Asbestos Cement Force Main in Israel

    Following failure of a 50” Asbestos Cement force main in Tel Aviv, Israel, a failure analysis was undertaken to determine the cause of failure and the risk of further incidents. This identified the possibility of further catastrophic bursts of the force main. Fully structural rehabilitation was designed using a hybrid reinforced concrete and ferrocement approach in order to meet all of the ...

  • Asbestos in Buildings: Practical Guidelines for Building Owners

    Practical guidelines for building owners Overview Friable asbestos-containing materials are present in many public and commercial buildings, schools and factories built before the mid-70's. Regulations in Ontario and some other provinces require building owners and property managers to put in place asbestos control programs, once they are aware of the presence of friable asbestos-containing ...


  • Environmental Assessment Brownfield Study

    In late 2011, Global was contracted by the Genesee County Land Bank and City of Flint to prepare an Environmental Assessment (EA) in accordance with guidelines set for by the U.S. Department of Housing and Urban Development (HUD) 24 CFR Part 58 for the Smith Village Project. Global utilized the HUD recommended format during the preparation of the EA including completion of the Statutory Checklist ...

  • Asbestos and Man-made Mineral Fibres in Buildings: Practical Guidance

    Contents Key Points 1: Introduction 2: What are asbestos and man-made mineral fibres? ...

  • Mishandling of Hazardous Materials & Contaminants, Asbestos, Lead, Mould & Fungus, PCB`S

    Untitled Document Everyday in Canada and the United States Hazardous Materials are being removed improperly contaminating the buildings we occupy. The hazardous materials including ...

  • Environmental risk assessment of a closed industrial landfill

    Client: Waste Management Industry Location: Closed landfill, Warwickshire, UK Services: Hydrogeological risk assessment and Closed landfill support Issues: Potential risk to groundwater and surface water, environment and human health. Gaps in available data for closed landfill site. Summary: ESI ...

  • Quantitative pipe condition assessment with Pipe Penetrating Radar

    Abstract Pipe Penetrating Radar (PPR) is the underground in-pipe application of GPR, a non-destructive testing method that can detect defects and cavities within and outside mainline diameter (>18 in / 450mm) non-ferrous (reinforced concrete, vitrified clay, PVC, HDPE, etc.) pipes. The key advantage of PPR is the unique ability to map pipe wall thickness and deterioration including voids ...


    By SewerVUE

  • Doing the Deal Part 2: Property Assessments

    Providing support for major business transactions is arguably the most important strategic responsibility of an EH&S manager. The potential cost savings (if done correctly) or liabilities (if done poorly) can be enormous. A company may bet its future success on a single business acquisition or merger. Even purchases or divestments of plant and equipment can have a profound effect on a ...

  • Conducting The Phase I Assessment - Records Review

     This is the second in a series of five articles relating to conducting Phase I Environmental Site assessments. Each article attempts to give the reader a thorough understanding of a specific aspect of the Phase I process and Clayton’s commitment to meeting or exceeding the requirements of ASTM Standard E 1527 Standard Practice for Environmental Site Assessments: Phase I Environmental Site ...


  • Conducting The Phase I Site Assessment - Historical Use

    This is the first in a series of five articles relating to conducting Phase I Environmental Site Assessments. Each article will attempt to give the reader a thorough understanding of a specific aspect of the Phase I process and Clayton's commitment to exceeding the requirements of ASTM Standard E 1527 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment ...


  • Fawley Power Station– Case Study

    Project Highlights Asbestos air monitoring associated with asbestos removal and remediation was undertaken on the Fawley Power Station site on a daily basis for a duration of four years on behalf of CAPE Plc. Demolition asbestos survey have also been undertaken of all buildings due to demolished as a consequence of the ...

  • Case Study: Major Southern California Studios

    Most studios require - and Ellis is pleased to provide - emergency response services, from mold testing, to indoor air, to asbestos removal. Most recently, Ellis managed a $40,000 cleanup of the air supply system of a huge filming stage, following a fire and resultant smoke damage. Other services provided since 1995 include numerous asbestos and lead surveys, abatement projects, soils testing, ...

  • Bournemouth Airport (2) – Case Study

    Project Highlights Asbestos Awareness Lecturing Type 1,2 and 3 asbestos surveys Creation of asbestos removal specification Generating independent quotations Independently generating best ‘fit’ for client Asbestos Removal Project management Asbestos air ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you