ASTM D 6523-00 Articles

  • Performance Comparison of RO and NF Systems

    The nanofiltration train (NF-A) and reverse osmosis train (RO-A) at Port Hueneme Brackish Reclamation Demonstration Facility in Southern California have both suffered from biofouling since startup in November 1998 until the plant implemented a raw water chloramination scheme in June 2000 (around 13,500 hours of operation). Moreover, the nanofiltration membrane elements also suffered from a ...


    By MASAR Technologies, Inc.

  • Software warns of early membrane fouling

    A software system known as MASAR – Membrane Alarm System and Automated Reporter, is proving to be a valuable tool for monitoring and optimizing membrane – based water purification and desalination plants. It can detect the early development of membrane fouling/scaling in RO, NF, UF and MF systems by monitoring performance and measuring an early-warning parameter called the Fouling ...


    By MASAR Technologies, Inc.

  • Measuring Geomembrane Tensile Strength – 1” or Dumbbell?

    Abstract: Specifying a tensile strength or % elongation for any given application is necessary to avoid any possible failure in the geomembrane.  There are many factors to consider including: testing equipment, thickness, load cell, type of grips, and sample geometry.  Although ASTM D7176 currently requires a 1” tensile strip, they will be considering a dumbbell-shaped sample as ...

  • Real-Time Membrane Fouling Monitoring

    The Port Hueneme Water Agency (PHWA) has been operating a municipal drinking water treatment plant designed to be a Brackish Water Reclamation Demonstration Facility. The facility consists of 3 separate side-by-side full scale systems or trains, each representing a major membrane separation process: nanofiltration (NF), reverse osmosis (RO) and electro dialysis reversal (EDR). Both the NF and RO ...


    By MASAR Technologies, Inc.

  • Ground Zero Air Quality Has A Long Way To Go! A Summary of Air Quality Testing in Surrounding Buildings

    There are still a wide range of concerns about air quality in the vicinity of Ground Zero. Many commercial and residential spaces have yet to be re-occupied. In only a few cases has any sort of inspection or testing been done to determine if they are safe to occupy. The greatest concerns are asbestos and the very irritating concrete dust that spread throughout lower Manhattan during the collapse ...


    By Atlantic Environmental, Inc.

  • Sample Handling Strategies for Accurate Lead-In-Soil Measurements in the Field and Laboratory

    ABSTRACT The inhomogenous lead-in-soil matrix can present serious obstacles to accurate sample collection and handling. In typical lead-in-soil measurement, particle size related errors in sampling and sample handling often exceed all other sources of error. The magnitude of error can vary widely depending on the particulate nature of the lead contaminant and the effectiveness of control ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you