Aire-O2’s Cold Weather Legacy - Industrial Wastewater Treatment System - Ft. Frances, ON, Canada - Case Study
Project Background Bose Cascade’s Ft. Frances, Ontario kraft mill operation faced a wastewater treatment problem due to dead spots in nearly half of its aerated stabilization basin. The mill site is located in Northern Ontario, Canada, halfway between the nation’s east and west coasts. The mills produce modified kraft mill and groundwood effluent that receives PH adjustment and ...
-
Oostanaula Creek WWTP; Jet MCR Multi-Channel Orbital BNR - Case Study
The Oostanaula Creek WWTP in the City of Athens, TN was a forty year old conventional activated sludge facility permitted for 2.83 MGD. Client: Oostanaula Creek WWTP in the City of Athens, TN; Jet MCR Multi-Channel Orbital BNR Process Solution: Jet MCR Multi-Channel Orbital BNR Process Background: The facility consisted of two twelve foot deep concrete lined earthen basins with low speed ...
-
Submerged Fixed Film: Top 5 Considerations for Evaluating Different Systems
Submerged fixed-film systems are ideal for significantly increasing nitrification in existing wastewater treatment plants. A well-designed and operated system can double the nitrification capacity of an existing aeration basin. When choosing media for fixed-film applications, typical options include small, floating biomass carriers (moving bed systems) or structured-sheet PVC modules fixed in ...
-
Silivri Municipality - Case Study
Project Name Silivri Municipality Wastewater Treatment Plant Employer Silivri Municipality Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Istanbul/TURKEY Scope of work Domestic Wastewater Treatment Plant Contract Date 1995 Completion date 1995 Flowrate of the plant: 1.400 m3/day Units of the Plant: Physical Treatment Unit Static Screen ...
-
CH#825 - Improved Phenol Bio-Degradation
BackgroundThe treatment plant at this industrial facility treats approximately 0.3 mgd waste containing phenolic compounds. Over the past year the treatment works has improved performance and consistently been able to produce good quality effluent with respect to phenol, however, an improvement in performance was required to meet future discharge limits. To achieve this level of treatment, the ...
-
Nitrification of municipal effluents in fluidised bed reactors using immobilised microorganisms
1. The problem Existing municipal effluent treatment plants designed earlier for the BOD removal are usually not suitable for nitrification at low temperatures, because of : Small plant dimensions and low sludge age, respectively Biokinetical reasons. Consequences are that in the cases of nitrification expensive plant extensions are required. 2. Our problem solution results in Plants ...
-
Pump and mixer team to treat wastewater - Case Study
Problem Serving 11,000 residents, the Stafford (Conn.) Water Pollution Control Facility needed an upgrade. Solution To improve maintenance and equipment service life, plant personnel installed six 1.8 hp Landia mixers in the anoxic tanks as part of a new activated sludge process. Three 2.4 hp Landia axial flow pumps were added to the aeration basins to return nitrified mixed liquor to the ...
-
Town of Manhattan, MT 400,000 GPD Bio-wheel plant case study
The Manhattan treatment plant is a 400,000 GPD plant in two trains, containing six 24 x 5.0 Bio-WheelTM. It is able to nitrify and denitrify, with two anoxic basins ahead of the aeration basins. Two conventional flight and scraper clarifiers are used. Three Penn Valley RA S/MLSS pumps are located in a separate pump room. The plant is designed for a future expansion to 0.8 MGD. At this time the ...
-
Airlift bioreactors: Application to wastewater treatment
After an introductory review, this paper presents a three-phase reactor fluid dynamic model that is used in the development of a generic process for upgrading existing wastewater treatment plants (WWT). The aim is to incorporate nitrification and de-nitrification without additional reactor volume. The core of the process consists of an attached growth airlift reactor (AGAR) in which a biomass ...
-
Pulp & Paper Mill’s #1 ASB Lagoon cleanout goes directly into Geotube containers - Case Study
Abstract: Integrated pulp & paper mill with an aerated stabilization basin built in 1969 was so full of solids that the mill was having several problems: degradation of treatment performance, inability to access aerators for maintenance, safety concerns, high energy usage, severe short circuiting. The decision was made that #1 Lagoon must be cleaned out. Evaluation of all types of removal, ...
-
Performance of mechanical aerator in wastewater treatment with special reference to oxidation ditch: a critical review
Mechanical aerators used in wastewater treatment are the largest energy consumers in biological reactors. Well-known researchers have been working on the oxygen transfer by mechanical aerators in oxidation ditch process and they have successfully enhanced the efficiency of aeration system with considering the factors affecting oxygen transfer such as speed of rotors and geometry of aeration ...
-
Glendale, AZ, Treatment plant protected by SewerGard - Case study
Project: Glendale West WWTP Expansion Location: Glendale, Arizona Owner: City of Glendale Engineer: Malcolm Pirnie - Phoenix, AZ General Contractor: Sundt Constructors, Inc. - Tempe, AZ Applicator: Optco - Gilbert, AZ Sauereisen Representative: Roger Bird, RNS Distributing, LLC Products: No. 210T SewerGard Method of Application: Trowel application. No. 210T was first applied as a ...
-
Nishad Mills Limited – Case Study
Project Name Nishad Mills Ltd. Employer Nishad Mills Ltd. Contractor Enta Miihendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Karachi/ PAKISTAN Scope of work Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 1.500 m3/day Inlet PollutionParameters: COD: 1100 mg/L SS: 85-135 mg/ L PH: 6-10 Units of the Plant: Physical ...
-
Semicentralized greywater and blackwater treatment for fast growing cities: how uncertain influent characteristics might affect the treatment processes
The SEMIZENTRAL infrastructure approach has been developed for fast growing cities, to meet their challenges regarding water supply as well as biowaste and wastewater (WW) treatment. The world's first full-scale SEMIZENTRAL Resource Recovery reference plant has been implemented in Qingdao (PR China). Greywater (GW) and blackwater (BW) are collected and treated separately. Measurement of ...
-
Eliminating Severe Water Hammer issues W/Proco Proflex Style 750 - Case Study
Rubber duckbill design of Proco check valve solves water hammer problems for Town of Boone, N.C. The Jimmy Smith Wastewater Treatment Plant (WTP) is located in Boone, N.C., a town of 17,000 that sits at an elevation of about 3,300 ft. With a permitted capacity of 4.82 million gpd, the plant serves Boone as well as the Appalachian State College and a few businesses outside of the city’s ...
-
Aydin Municipality – Case Study
Project Name Aydin Municipality Slaughter House Wastewater Treatment Plant Employer Aydin Municipality Contractor Enta Miihendislik Aritma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Aydin/TURKEY Scope of work Industrial Wastewater Treatment Plant Contract Date 2003 Completion Date 2004 Tesisin Debisi:100 m3/day Inlet PollutionParameters: BOD: 1000-1200mg/L Outlet Discharge ...
-
Case Study: Kuusakoski Ltd
Kuusakoski Ltd is one of the leading recycling companies in the Baltic region. At one of their waste stations a Waterix AIRIT® 200 aerator was installed in the filtration water basin in autumn 2006. The volume of the drainage basin is 6000 cubicmeters and normally the water level is kept at 2000 cubics. The environment is challenging, as there is lots of ammonium nitrogen and chlorides in the ...
By W-Rix Ltd
-
Ortaklar Organize – Case Study
Project Name Ortaklar Organize Sanayi Bdlgesi Wastewater Treatment Plant Employer Ortaklar Organize Sanayi Bdlgesi Contractor Enta Muhendislik Aritma Taah. San Tic. Ltd. §ti. Location of the plant AYDIN/TURKEY Scope of work Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 2.000 m3/ day Inlet Pollution Parameters: COD: 1.500 mg/L SS: ...
-
IFAS for Enhanced Biological Nutrient Removal Case Study
Wastewater treatment plants that employ conventional biological treatment processes designed to meet secondary treatment effluent standards typically do not remove total nitrogen (TN) or total phosphorus (TP) to the extent needed to protect receiving waters. However, wastewater treatment facilities are increasingly being required to address this issue by implementing treatment processes that ...
-
Mem Textile – Case Study
Project Name Mem Textile San.Tic. A.§. Wastewater Treatment Plant Employer Mem Textile San.Tic. A.§. Contractor Enta Miihendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant MARA§/ TURKEY Scope of work Industrial Wastewater Treatment Plant Contract Date 2011 Completion Date 2012 Flowrate of the plant: 5.000 m3/day Inlet Pollution Parameters: COD: 1400 mg/ L SS: ...