biogas desulphurization plant Articles

  • Case study - Procurement and installation of a Biogas desulphurization unit at the Chania WWTP

    A proposal based on Bioconservacion’s technology was selected as the winning bid in the public tender released in 2015, covering the design, procurement and construction of a biogas desulfurizing unit to be installed in the waste water treatment plant in Chania, Greece. With a population over 100,000, Chania is the second largest municipality in the Greek island of Crete. Its waste water ...


    By Bioconservacion SA

  • Green Light for Recycling – Biogas has an exciting future - Case Study

    The tipping lorry of the container vehicle moves up. In minutes, its load of food residue is emptied and starts its course to energy recovery. "Energy for tomorrow" is the slogan of the Danpower Group for a reason. Danpower sees the biogas sector as a key growth factor for the future. Twenty five biogas plants are currently in operation, one of which is in Bad Köstritz/Thüringen. ...


    By HSM GmbH + Co. KG

  • Case study: Roager Bioenergi

    Substrate: Energy crops, animal manure, other organic material Biogas flow: 1.200 Nm3/h H2S inlet: 2.000 ppm H2S H2S outlet: 50 ppm H2S Year of Installation: 2011 Roager/Lundsby Bioenergi is located in the southern part of Denmark. It is a unique biogas plant as the input is a mixture of animal ...


    By Biogasclean A/S

  • Case study: Maabjerg Bioenergy

    Substrate: Animal manure and food waste Biogas flow: 3.600 Nm3/h H2S Inlet: 3.000 ppm H2S Outlet: 80 ppm Year of installation: 2012 The Maabjerg plant is a collaboration between agriculture, municipalities and the district heat station and is situated in the northern part of Denmark. When in full ...


    By Biogasclean A/S

  • First commissioned LFG power generation unit in Iran

    The first landfill gas (LFG) power generation station in Iran was officially commissioned in July 2009. This plant is located in old landfill site of Mashhad, the second largest city in Iran. This landfill has been receiving municipal solid wastes (MSW) since 1975 but the first activity for biogas extraction in this site was started in 2000. The LFG extraction system in this site is based on ...


  • Case study - Aviko Lomm

    UASB refurbishment in the potato industry HydroThane STP refurbished the Upflow Anaerobic Sludge Bed Blanket (UASB) treatment plant from the 1990's at Aviko Lomm, The Netherlands. The UASB plant have been operating for more than 20 years and to guarantee further safe and sustainable operation - refurbishment was a necessity. Client Aviko is one of ...


    By HydroThane STP BV

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you