borehole installation Articles

  • Geodrilling International - Installation of Closed-loop Borehole Probes

    The installation of closed-loop borehole probes is a challenge on almost any project. With many domestic clients requiring a large meterage of borehole to be installed in a small site, Nicholls Boreholes has found that the traditional manual installation of closed-loop borehole probes is no longer a safe or acceptable option. The company has developed the Loop Feeder, a hydraulically-driven, ...

  • Waterquality in irrigation canals and boreholes - Greece

    Background Kavala is located in the North East of Greece, 680 km from the capital Athens. The population of the prefecture of Kavala is around 85,000 people. The River Nestos which flows through this prefecture is very important for the agriculture of the area. To allow for a fair distribution of the water for irrigation purposes, a number of Boreholes and canals have been established. The ...


    By OTT HydroMet

  • Isolate & sample up to 7 zones in one borehole

    CMT Multilevel Systems isolate and monitor up to seven discrete zones in one borehole; monitor 7 zones in the 1.7" (43 mm) System; 3 in the narrow 1.1" (28 mm) System. Both options are low cost. The single tube design makes them fast and easy to drill and install in one day. System flexibility allows port locations and monitoring strategy to be finalized right on site. CMT wells are ideal for ...


    By Solinst Canada Ltd.

  • Scanning proposed borehole locations for Utilities case study

    Environmental and engineering firms often are tasked with performing soil borings for monitor well installation as part of a Phase II Environmental Site Assessment. This task becomes more challenging when the borings are to be installed in gasoline stations, right of ways or other areas where there are numerous underground utilities that are either unmarked or not properly located. GeoView can ...


    By GeoView, Inc.

  • H-ADCP Flow Gauge Installation

    Wessex Water contracted HL to install a new flow-gauge to provide flow data on the environmental impact of abstraction upstream and downstream of a riverside borehole for public-supply. Due to the channel and hydraulic conditions at the site on the River Yeo in Somerset, HL selected a horizontal ADCP Channelmaster device from Teledyne RDi for providing accurate velocity profiles at one elevation ...

  • KASTHEW Borehole-Drilling Company Uganda Ltd Co. Profile; http://www.kasthewdrilling.co.ug/

    www.kasthewdrilling.co.ug We are Kasthew Borehole / Water Drilling Company Ltd (Uganda). We offer bore-hole drilling services under our company (Kasthew Drilling Co. Ug Ltd). Our team has an experience of handling above 420 projects (in the last 8 years across villages in Uganda and South Sudan. www.kasthewdrilling.co.ug The following are among our listed services; (Uganda) ...

  • Deployment of a Deep Borehole Observatory at the High La ke Project Site, Nunavut, Canada

    Abstract We deployed a deep permafrost observatory in a borehole at the High Lake Project Site (67°22'N, 1I0°50>W), Nunavut, Canada with the aims of (1) investigating the physical and chemical limitations on microbial life within such environments, (2) developing life-detecting technologies for the exploration of life on Mars and (3) constraining the hydrological and thermal ...


    By In-Situ, Inc.

  • Hydrogeological and environmental impact assessment of a geothermal closed loop ground source energy installation

    ESI in Milan was approached to give support for designing one of the largest closed loop systems for heating and cooling in Europe.  The system was installed at the IKEA store in Corsico, Milan, with the need to provide some 1.4 MWth and covering thermal energy demand in the range from 40 to 100%.  The closed loop system is expected to save the Client over 500 t/y in CO2 ...


    By ESI Consulting Ltd

  • Landfill groundwater monitoring network design and construction quality assurance (CQA)

    The site is an active landfill site situated in the north east of England.  The company managing the site was unhappy with the groundwater monitoring infrastructure around the site margins. ESI Ltd was commissioned to advise on locating and designing ten groundwater monitoring wells.  Following agreement with the Environment Agency, we also provided independent construction quality ...


    By ESI Consulting Ltd

  • South East framing review

    Drilling a borehole on a farm can cost less than a conventional water supply and cut the carbon footprint from pumping and treating mains water. "There is an environmental as well as a cost argument for drilling a borehole,' said Ben Nicholls, joint managing director with his brother Richard of Nicholls Boreholes, which is based in West Sussex. Nicholls Boreholes is in an office on an ...

  • IEG multi level sampling well (MLSW) case study - IEG Technologie GmbH

    The MLSW-system is used for the recovery of multiple high-quality samples of soil-gas and groundwater from numerous isolated horizons in a single standard borehole. The system is also used to accurately delineate contamination profiles in three dimensions, which is vital or the design, installation and monitoring of remediation systems. MLSWs also can be used for activly dispersing substances ...


    By IEG Technologie GmbH

  • Case Study, Colnbrook Leachate Plant.

    Triangle Ltd was contracted in 2008 by Biffa Waste Services at Colnbrook, Heathrow to resolve the problem of the landfill leachate borehole pumping system failing to deliver acceptable volumes to the SBR leachate plant. Initially they were achieving a maximum of 110m³/month during the fill/aerate treatment ...


    By Triangle Ltd

  • Channel Tunnel rail link - groundwater model of the basal sands and chalk

    ESI used a groundwater model of the basal Sands and Chalk underlying central London to assess the dewatering impacts of tunnelling as part of the construction of the Channel Tunnel Rail Link (CTRL). A number of boreholes were to be installed for dewatering purposes whilst the tunnel was being driven.  Due to access constraints, the selection of borehole locations was difficult.  The ...


    By ESI Consulting Ltd

  • National Grid, Croydon case study

    Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The project was required to ...


    By Hydro-Logic Services

  • Horizontal Wells - Technology Overview

    Horizontal well technology has been incorporated into many current environmental remediation applications (and associated contaminants), such as in situ bioremediation, air sparging, vacuum extraction, soil flushing, free product recovery, etc. Ac cording to information reviewed, this technology is most applicable to sites with relatively shallow soil and/or groundwater contamination, and can ...

  • Advances in Multilevel Well Technology

    Several detailed field studies performed at research sites in the 1980’s and 1990’s suggest that most contaminant plumes exhibit large variations in concentration over small vertical distances. These variations are caused by spatial variations in the contaminant source zones and heterogeneity of the geologic materials. Conventional monitoring wells have been shown to be ineffective for accurately ...


    By Solinst Canada Ltd.

  • H-ADCP Flow Gauge, Wessex Water case study

    Wessex Water, Design, supply and installation of low-flow environmental impacts monitoring system on the River Yeo in Somerset, 2005-2008 Wessex Water contracted HL to install a new flow-gauge to provide flow data on the environmental impact of abstraction upstream and downstream of a riverside borehole for public-supply. Due to the channel and ...


    By Hydro-Logic Services

  • Norfolk CC tackle groundwater contamination with low-flow

    Quick and easy access in deep wells Geotech low flow groundwater analysis equipment has enabled quick and easy access to samples at 2m intervals down a 28m screen in deep boreholes. Elizabeth Guilford of Norfolk County Council hired the low flow kit from Geotech and used it on a Norfolk CC landfill where leachate contamination of groundwater was suspected. Samples taken at 2m intervals ...

  • Norfolk County Council tackle groundwater contamination with low-flow - Case Study

    Geotech low flow groundwater analysis equipment has enabled quick and easy access to samples at 2m intervals down a 28m screen in deep boreholes. Elizabeth Guilford of Norfolk County Council hired the low flow kit from Geotech and used it on a Norfolk CC landfill where leachate contamination of groundwater was suspected. Samples taken at 2m intervals close to elevation of the suspected ...

  • Turbidity Warning System

    Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you