borehole level Articles

  • Hydrometric Network Data Management

    A key part of HL's contract with Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetred reservoir level and compensation flow gauges, a suite of HL's software packages was also supplied to each of the three operational areas for managing time-series data and processing stage-discharge data into a long-term flow record archive. HL's HydroLog4 and Gauger 2 packages ...


    By Hydro International UK

  • Dwr Cymru Welsh Water case study

    Dwr Cymru Welsh Water, Wales, 2000 - 2008 (ongoing) Rehabilitation and ongoing maintenance of Hydrometric network for monitoring water abstraction and compensation flow gauges across the whole of Wales. Hydro-Logic has been commissioned by Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetry enabled reservoir level and compensation ...


    By Hydro-Logic Services

  • DCWW Network Maintenance

    Hydro-Logic has been commissioned by Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetry enabled reservoir level and compensation flow gauges across the whole of Wales. The initial contract covered five years and following an EU OJEC re-tendering process, a new contract for six years was awarded in April 2006. Both contracts include the survey and rehabilitation of ...


    By Hydro International UK

  • Hydrometric Network, DCWW case study

    Dwr Cymru Welsh Water, Wales, 2000 - 2008 (ongoing) Rehabilitation and ongoing maintenance of Hydrometric network for monitoring water abstraction and compensation flow gauges across the whole of Wales. Hydro-Logic has been commissioned by Dwr Cymru Welsh Water to install, operate and maintain a large network of telemetry enabled reservoir level and compensation ...


    By Hydro-Logic Services

  • NEW GROUNDERWATER REPORT PREPARED FOR KALGOORLIE CONSOLIDATED GOLD MINES(KCGM) IN WESTERN AUSTRALIA

    For many of our clients the impact of water abstraction and use is an element of their operation which requires long term monitoring and analysis. Results are often compared to baseline data so that impact of operations can be understood and, if necessary, modified. This is frequently an arduous task with some of our clients having more than a 100 boreholes which are regularly monitored. This ...


    By EHS Data Limited

  • Measuring gases in AD and landfill – Which is the right product for your application?

    With over 30 years' experience in the landfill and biogas sector, Geotech is synonymous with gas analysis, supplying monitoring equipment to over half of the UK biogas and landfill market, with a further 4000 portable gas analysers sold throughout the world.  Geotech's product portfolio is tailored to satisfy a multitude of environmental monitoring requirements; our clients tell us the ...

  • Measuring gases in AD and landfill – which is the right product for your application - Case Study

    With over 30 years’ experience in the landfill and biogas sector, Geotech is synonymous with gas analysis, supplying monitoring equipment to over half of the UK biogas and landfill market, with a further 4000 portable gas analysers sold throughout the world.  Geotech’s product portfolio is tailored to satisfy a multitude of environmental monitoring requirements; our clients tell ...

  • Measuring gases in AD and landfill – Which is the right product for your application?

    With over 30 years' experience in the landfill and biogas sector, Geotech is synonymous with gas analysis, supplying monitoring equipment to over half of the UK biogas and landfill market, with a further 4000 portable gas analysers sold throughout the world.  Geotech's product portfolio is tailored to satisfy a multitude of environmental monitoring requirements; our clients tell us the ...

  • National Grid, Croydon case study

    Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The project was required to ...


    By Hydro-Logic Services

  • National Grid, Croydon case study

    National Grid, Croydon Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 - ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells ...


    By Hydro-Logic Services

  • Turbidity Warning System

    Morgan Est Contractors for National Grid Supply and installation of telemetred groundwater monitoring network, May 2006 ongoing Hydro-Logic recently completed the supply and installation of borehole instrumentation and a telemetry monitoring system to monitor groundwater conditions in 28 observation wells located at 19 sites in the vicinity of Croydon. The ...


    By Hydro International UK

  • Evaluating Cleanup at Hamilton Army Airfield Using EQuIS and ArcGIS

    The Sacramento District, US Army Corps of Engineers, is implementing EarthSoft's EQuIS and ArcGIS for better management, analysis, and response to landfill remedial activities being conducted at the former Hamilton Army Airfield. This former Air Force Base located four miles south of the city of Novato, on San Pablo Bay, in Marin County, California, is undergoing environmental clean-up as it is ...


    By EarthSoft, Inc

  • Occupational Hearing Loss: How Noise Monitoring Can Help

    Since the 1960’s, we have come to recognise the danger to hearing caused by loud noise.  Every day, many individuals around the world are exposed to the risks of occupational hearing loss through harmful levels of noise at work and, for these groups, regular noise monitoring is vital. It is easy to take your hearing for granted, but the complex process that occurs when your ...


    By Pulsar Instruments Plc

  • Reaching underground resources

    Accessing critical resources such as geothermal energy and natural gas requires drilling — an expensive, energy-intensive, messy process with today's technology. An MIT team has been looking into a more elegant approach. Instead of grinding rock to bits, they would use a continuous beam of energy to vaporize it and then blow out the tiny particles that form with a high-pressure stream of ...

  • Ethanol Production Plant Monitors Impacts to Water Supply and Stays in Compliance

    Application Under current ethanol plant configurations, water use for ethanol production ranges from 4.0 to 6.8 gallons of water required per gallon of ethanol produced. With the average new plant producing 120 million gallons of ethanol per year, water yields in excess of 1,000 gallons per minute are required; therefore adequate water supply is essential to the operation of an ethanol ...


    By In-Situ, Inc.

  • Multilevel Groundwater Assessment of Confining Unit in a Bedrock Sequence near Sarnia, Ontario

    Untitled Document INTRODUCTION Two sites in southern Ontario were studied through instrumentation ...


    By Solinst Canada Ltd.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you