  • Construction Site Guardrail - Case Study

    Problem: Construction sites often contain “unprotected sides and edges.” Solution: Construct a guardrail system to prevent employees from falling to lower levels. Kee Safety offers modular railing systems for simple installation in both aluminum and steel. OSHA Code 1926.501(b)(1) states that and unprotected side or edge which is 6 feet (1.8 m) or more ...


    By Kee Safety, Inc.

  • Handrail Addition: Post-Construction - Case Study

    Problem: Though when constructed, the ramp was not intended for use by individuals, regulations stipulated that a handrail must be available. Solution: Kee Klamp Type 70-7 was used to mount galvanized tubular handrail to the existing barrier without having attain a hot-work permit. ...


    By Kee Safety, Inc.

  • Pulley Track for Temporary Construction Pulley - Case Study

    Construction required tracks for a gliding pulley rig. The pulley rig needed to be hung temporarily in order to relocate materials from the ground to the top floors. BEAMCLAMP safe steelwork connection clamps were used to hang the track on permanent structural beams without drilling or welding. Once the track was no longer needed, it was ...


    By Kee Safety, Inc.

  • Steel to Steel Connections - Case Study

    An extensive range of building steelwork products designed for making OSHA compliant steel to steel connections for every construction need. Steelwork Products for Construction Kee Safety offers alternative methods of securing secondary steelwork and building services equipment to primary steelwork girders and framing members. Products include expansion anchors, clips and ...


    By Kee Safety, Inc.

  • B&A GROUP ACHIEVES SMAS SAFETY ACCREDITATION FOR FOURTH YEAR RUNNING

    As testament to our ongoing commitment to health and safety, Bristol & Avon Transport & Recycling has been awarded a SMAS Worksafe scheme certificate for the fourth year running. The accreditation shows we are serious about H&S and have systems in place to ensure that any work we are engaged in is, so far as reasonably practical, carried ...


    By Bristol & Avon Group

  • Innovative Application of Rooftop Railing - Case Study

    This particular application of KEEGUARD fall protection required creativity and ingenuity. There were many obstacles that made the installation of a straight run of guardrail unworkable. The railing had to go around air ducts, attach to some existing rail, and, in some cases, be mounted to the outer brick wall because of heating and cooling units ...


    By Kee Safety, Inc.

  • Water park security operations management from HAISAN water slide company

    First, Construction of the security system from HAISAN water slide company 1. Develop a safety management system; 2. Signing a safety responsibility letter; 3. Integrate safety into the performance appraisal system; 4. Establish a safety reward and punishment system; Second, the development of security awareness 1. All ...

  • Non-penetrating Skylight Screen Exceeds OSHA Standards - Case Study

    Skylights present a danger for any individual on the rooftop. OSHA considers skylights to be the equivalent of a hole in the roof. OSHA standard 1910.23(a)(4) says, “Every skylight floor opening and hole shall be guarded by a standard skylight screen or a fixed standard railing on all exposed sides.” Kee Safety has developed a skylight screen to exceed OSHA standards, (i.e. screen ...


    By Kee Safety, Inc.

  • What kind of taboos we should pay attention to when it comes to design for project of water park

    Safety problems After the design document appraisal, type test, inspection and acceptance of the water park equipment, if we use it accurately according to the operation instruction, the accident probability is extremely small. However, the lack of attention to details in the construction process is the biggest reason for the frequent occurrence of tourist injury accidents in the water park. ...

  • Magid Glove & Safety Manufacturing Company - Case Study

    Location:Romeoville, IL Project Size:3.5 MW EcoFoot2+ Ballasted Flat-Roof Mounting System was installed on the record-breaking 3.5 MW array for Magid Glove and Safety Manufacturing Company in Romeoville, IL. Completed in November 2018, this is the largest rooftop solar installation in the Midwest.  Electricity ...


    By Ecolibrium Solar

  • Clean Room Trade News

    Clean Room Panels Market: Drivers and RestraintsCleanrooms usage has increased in almost every type of industry where small particles are likely to affect the manufacturing process. Because of increasing standardization, stringent healthcare regulations, demand for quality product, demand for quality product, growing prevalence of contagious and infectious diseases, many companies are looking to ...

  • How Much Do You Know About Stainless Steel Honeycomb Panels?

    Stainless steel honeycomb panels The table plate is made of brushed stainless steel or mirror stainless steel, the back plate is made of galvanized steel, and the core material is made of aluminum honeycomb core, which is compounded by special adhesive. Its beautiful appearance makes it widely popular with architectural application and interior decoration. Main features of stainless steel ...

  • Portable Roof Edge Fall Protection - Case Study

    An Innovative Approach to Portable Safety Railing Systems KeeGuard® Contractor system is a free standing solution to roof edge fall protection that requires no hardware connections to the rooftop or working surface. KeeGuard® Contractor can be configured to meet all OSHA Standards for permanent railings, including OSHA Standard 29 CFR 1926.502, 1910.23 & NOMMA Metal Rail manual ...


    By Kee Safety, Inc.

  • Wet dust collection for Superfine metal dusts - Case study

    Whirl Wet Dust Collection System proves ideal for polishing operations. Gabilan Manufacturing, Inc. (Salinas, CA) produces all the mufflers used on Harley Davidson motorcycles. Quality is paramount: the polishing is preparation for chrome plating – arguably the most critical finishing process for high-end bikes. When new grinding and sanding ...

  • Acceptance Specification and Design of Dust Free Workshop

    1. Reasonable layout of process flow and building plane; 2. Choose building structures and materials that meet the characteristics of dust-free workshop; 3.Dust-free workshop design should select reliable and economical cold and heat sources according to the local energy supply background at that time. 4. Divide and arrange air-conditioning purification and exhaust systems; 5. Choose ...

  • Samanalawewa Dam Willowstick Survey - Case Study

    Willowstick rapidly located leak at dam troubled for decades After 18 years of unsuccessful remediation work costing tens of millions of dollars Willowstick identified the exact leakage pathway in less than a month. This enabled the client to carry out targeted remediation works at a fraction of the original cost. The leakage path identified by Willowstick was significantly ...


    By Willowstick Technologies LLC

  • Interstate Products Bladders Fuel & Water @ Interstate

    Interstate Products Inc. Water Bladder Pillow Tanks @ Interstate Interstate Products Inc. (IPI) has expanded its offering of water bladder tanks.  We have been busy as Interstate Products and have added manufacturers of Water Bladder Tanks (Pillow Tanks) to our full line of existing Interstate Products Water Bladders. The Portable line includes for Interstate clients fire-fighting and skinny ...


    By Interstate Products Inc

  • Beachside Holiday Cottage Project - Case Study

    Background A stone cottage built in the 1800s on Porthmeor Beach, St Ives, its fundamental attraction being its proximity to the sea. A beautiful beach property, it had no history of flooding, yet ever-changing climate conditions and increasingly higher tide levels became a concern. The ...


    By Aquobex Ltd.

  • Continuous dust monitoring with AirSafe - Case Study

    Application A producer of dry mortar needs dry sand and trass for the production process. Both materials are dried in a hot gas heater at a temperature of 500 °C before they are admixed. The hot gas heater uses brown coal dust as combustion material. The brown coal dust, which is stored in a silo, is transported via a rotary valve in free fall to a distribution plate. From there it ...


    By ENVEA