construction site cleaning Articles

  • Recent Federal Developments

    TSCA/FIFRA EPA Extends Comment Period For Draft Guidance For Pesticide Registrants On Notifications, Non-notifications, And Minor Formulation Amendments: On October 5, 2017, the U.S. Environmental Protection Agency (EPA) issued a notice of extension of the comment period for the draft guidance  ...


    By Bergeson & Campbell, P.C.

  • December BioCycle World

    Economic Impact Of Recycling In Texas The Texas Commission on Environmental Quality (TCEQ) released its recent study on the economic impact of recycling activities in the state. Approximately 9.2 million tons of MSW designated materials were recycled in Texas in 2015. Typical recyclables (paper, plastics, metal, and glass), organics (yard trimmings, brush, green waste, and food and ...


    By BioCycle Magazine

  • Essential Tips For Construction Equipment Cleaning

    Construction equipment cleaning is one of the most underestimated jobs in the construction industry. Cleaning of the construction equipment does not receive the due attention it deserves. Successful construction companies, though, ensure that construction equipment are cleaned thoroughly and professionally. The managers of these companies know that efficient and long lasting machines are ...


    By Daimer Industries Inc.

  • Simple Separation: Diverting Wood And Cardboard at Construction Sites

    Diverting Wood And Cardboard At Construction Sites Residential home construction in Wisconsin generates 128,000 tons of residuals annually, according to a 1998 study by Camp, Dresser & McKee. Ten builders are participating in a project to demonstrate how easily major components of this waste stream can be recycled. The Metropolitan Builders Association (MBA) of Greater Milwaukee, the ...


    By BioCycle Magazine

  • Using On-Site Biological Methods to Clean Up Soil

    Decontamination companies and researchers in France are working to restore polluted soil using treatments that range from biological methods to soil washing and incineration. The problem of polluted soil was dramatically illustrated prior to construction of the Stade de France soccer stadium built for the 1998 World Cup. The location of the site, on industrial wasteland just north of Paris, ...


    By BioCycle Magazine

  • SBR Wastewater Treatment Provides Large Clean-up on Small Site

    One of the largest capacity wastewater treatment plants in Europe is under construction on a small plot of land at Ringsend, on Dublin Bay in Ireland. Sequencing batch reactor (SBR) technology and 100,000 diffusers from ITT Industries' Sanitarie unit was selected to meet the challenging waste treatment needs for this site. When Dublin's wastewater treatment plant was built in the 1970s, it ...


  • Geotextiles in Construction Dewatering

    Woven geotextiles work wonders in dewatering applications as wraps around well screens and sump pit screens. The textile can be sewn into sleeves or tubes to be slid over the well screen or sump pit framework. This technique allows the user to compensate for well screens with slots that are too large or for sump pit piping with large perforations. By adding the geotextile sleeves the user ...

  • Challenges at MSW Landfill Sites

    Covering the day’s trash at the landfill Today’s municipal solid waste (MSW) landfills are much more than places to dump household trash. They’re engineered facilities that are designed to hold and isolate the trash from the environment and are governed by both federal and state regulations. Landfill designers and operators face two main challenges ...


    By FINN Corporation

  • Chemical cleaning case study

    The passivation solution used was chosen by the customer following extended negotiations with their client relating to the advantages of Citric Acid over the use of Nitric/Hydrofluoric and the relative safety features of each solution. Progressive Technical Services opted to use a three dimensional rotating tank washing machine and a specialist high head pump normally associated with the cleaning ...

  • The natural way to clean wastewater

    John Todd founded Ocean Arks International in the 1980s, where he started to experiment with processes that mimic natural ways to purify wastewater. He built a greenhouse and ran sewage through a series of tanks, with plants suspended in the flowing waters, and constructed marshes made of sand and gravel. No chemicals were added, but plenty of aquatic creatures from snails to small fish were ...


    By BioCycle Magazine

  • Excavation, Retrieval, and Off-Site Disposal

    Introduction: Contaminated material is removed and transported to permitted off-site treatment and/or disposal facilities. Some pretreatment of the contaminated media usually is required in order to meet land disposal restrictions. Confined disposal facilities (CDFs) are engineered structure enclosed by dikes and designed to retain dredged materials. A CDF may have a large cell for ...

  • One of Europe’s most contaminated sites

    VSD Avenue, a joint venture partnership between VolkerStevin, DEC and Sita Remediation, started work at the beginning of September on the remediation of the former Avenue Coking Works in Chesterfield; one of the most heavily contaminated sites in Europe. Guy Pomphrey, chairman of VSD Avenue, explains The £82m contract, signed in July, was commissioned by the client and site owner the East ...


  • Coming Clean with the Environment

    Long Island is a long, slender island located directly east of Manhattan in the southern tip of New York State. In the 20th century, the north shore of Long Island earned the nickname of “Gold Coast” and attracted large private estates of the likes of the Vanderbilts, Roosevelts, Whitneys, Charles Pratt, J. P. Morgan, F. W. Woolworth, and others. The western end of the island includes ...


    By WesTech Engineering, Inc.

  • Waste Minimisation and Recycling: Fletcher Construction Australia

    A test project involving simple, practical waste minimisation and recycling measures, has helped Fletcher Construction cut its waste removal cost by more than half. The measures did not involve any capital cost, but they have resulted in substantial savings to both the company and the environment: savings of 55% were achieved on waste removal costs through recycling and input reduction, which ...


  • Prevent hospital acquired infections during construction projects

    The issue of hospital acquired infections is a serious problem. According to several sources, three to four million hospital-acquired infections occur annually, with up to 80,000 fatalities. The costs of these infections are estimated to be between $4 billion and $5 billion per year (Air-Treatment Systems for Controlling Hospital acquired Infections, HPAC Engineering, April 2, 2008).Healthcare ...

  • Post Construction Cleanup and Restoration with Gas Pressure Washers

    After the completion of construction, the building or structure has to be thoroughly cleaned, removing excess grime and dust from walls, floors, sidewalks, and similar structures. One way to achieve fast and efficient cleaning is through the use of a powerful gas pressure washer. You may use an electric pressure washer as well, but most contractors use a gas pressure washer as these machines do ...


    By Daimer Industries Inc.

  • Extensive remediation of superfund site - case study

    The 80 acre site, formerly a minerals processing facility, was operated primarily to recover lithium and other rare-earth minerals from ores. Raw ores were imported to the site for processing. During one phase of its operations, the facility also processed uranium ores for the government. The site was listed as by the U.S. Environmental Protection Agency (EPA) as a Comprehensive Environmental ...

  • Asarco Plant site remediation case study

    Asarco, Inc. Omaha, Nebraska, USA For more than a century, the former American Smelting and Refining Company (Asarco) operated a lead refinery on the banks of the Missouri River in Omaha, Nebraska. Plant closure in 1997 presented an opportunity to reclaim the riverfront as public space. Led by HDR, this successful transformation became the largest voluntary clean up ...


  • Case study - World`s largest remediation site

    Overview Hong Kong's Kai Tak Airport, the world's busiest airport in 1997, became the world's largest remediation site once it was closed. When the airport was decommissioned in 1999 in favor of the new Chek Lap Kok Airport, the government planned to rapidly clean up the site for commercial and residential development. After many years of soil penetration by various ...

  • Integrated Site Closure Achieves Business and Regulatory Goals

    A new concept for cleanup of contaminated properties and hazardous waste sites applicable under federal and state regulatory programs is helping clients achieve both business and regulatory goals at their sites. The concept, called 'Integrated Site Closure', is the seamless integration and delivery of services necessary to reach regulatory closure of contaminated properties. Regulatory closure ...


    By AECOM

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you