digester gas dryer Articles

  • Thermal hydrolysis, anaerobic digestion and dewatering of sewage sludge as a best first step in sludge strategy: full scale examples in large projects in the UK and strategic study including cost and carbon footprint.

    Abstract This paper shows that by using thermal hydrolysis process (THP) as a pre-treatment for anaerobic digestion (AD) it is possible to develop a step wise approach to sludge strategy that is cost effective and flexible. By generating a low volume of non odorous, well dewatered and safe digested cake it is possible to recycle sludge directly to agriculture or dry it for fuel use or ...


    By Cambi AS

  • Springfield MA case study

    At Their Disposal Komline-Sanderson minimizes solid waste disposal costs in Springfield, Mass The City of Springfield, Mass., currently uses a contract composting facility, which is located at the 65 MGD Bondi Island Wastewater Treatment Plant to dispose of their solid waste. The composting facility requires a feed of 40–45% solid materials to ...


    By Komline-Sanderson

  • Paragould AR case study

    Maximum Capacity Expected Increased population in Paragould, Ark., forces city to expand wastewater treatment plant to better manage sludge disposal Does this sound familiar? Your lagoon is filling with both primary and secondary sludge, and will be at capacity within the next two years. Paragould, Ark., a growing city of 22,500 located in northeast Arkansas, had just that problem. ...


    By Komline-Sanderson

  • Gatineau Sewage Treatment Plant, Gatineau, Quebec, Canada

    Project No. 1 Industrial Boiler Application A FLU-ACE waste heat recovery system installed to process all flue gases from three boilers. The system recovers up to 3.5 mmBTU/h of waste heat which is re-used for heating the digester sludge. The main fuel for the boilers is recycled methane based sewage gas generated from the plant’s anaerobic digesters. 'The installation ...

  • 1st Tech applications range case study

    Paper industry: roller, air compressor, after cooler, calender bowl, chemical scrubber, closed cooling system, condenser, cooling tower, gas cooler, heat exchanger, intercooler, filtrate tank, filtrate pipe, vacuum filter, vacuum pump, slush pump, lime pump, evaporimeter, digester, scrubber, flow box, squeezer, indirect cooler, absorption plant, gas steam room, steam ...


    By Mibo International Corp.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you