dry well pump station Articles

  • Suwanee Creek pumping station, Gwinnett County, GA

    That's high head," says Roger Toebben, P.E., about the 350 feet of total dynamic head handled by the Suwanee Creek Pumping Station, which has been up and running since January 2001. "There are a few sewage pumping stations like this, but they're not real common." Very high static head and a long force main (42,500 feet) led to the notably elevated dynamic head, which meant that a ...


  • Application Data for Dry-Scrubbing Media in Collection Systems

    Abstract Dry-scrubbing systems have been used for many years to control odors in wastewater applications. The systems have ranged in size from larger multiple bed scrubbers for force mains and large pump station applications to smaller single bed systems and modular systems in small wet wells, motor control centers, and other areas. Two reasons for their continued use are simplicity of ...


    By Dimtech S.A

  • Deep soil mixing shoring system to construct a 60 MGD, 40 foot deep wastewater pumping station

    The City of San Mateo, CA operates three wastewater pumping stations on a 80' wide lot located in a residential area near San Francisco Bay. The age of the stations range from 12 to 50 years, the stations have difficulty pumping peak wet weather flows, and have structural and maintenance problems. For these reasons, a new station was proposed to replace the existing stations. The site layout is ...


    By Geo-Con, Inc.

  • Desubmerge Your Submersible Pump

    A few decades ago, well, definitely not more than four, a contractor was introduced to electric powered submersible pumps. The crew’s first reaction was, “What! You’re going to throw that electric motor in the water? You’ve got to be crazy!” After a few weeks of getting comfortable with the subs, the whole crew was handling them like ...


    By Griffin Dewatering

  • Lift Station Odor Control Using CARUSOL Treating a Wastewater Collection System in a Mid-Western Township - Case Study

    Summary A mid-western township is responsible for operating and maintaining a combined sewer collection system consisting of 150 miles of pipeline and 28 pumping stations. The township does not treat the wastewater, instead contracting with a neighboring city for this service. The township has two final lift stations that transfer the collected wastewater to the neighboring system ...


    By Carus Corporation

  • World’s largest compressible media filtration plant eliminates combined sewer overflows, with potential for dry-weather use

    The City of Springfield, Ohio, recently opened its 100 MGD enhanced high-rate treatment facility, designed to treat and disinfect combined high-volume stormwater and wastewater flows generated by wet-weather conditions. Utilizing EPA-documented Compressible Media Filtration technology – FlexFilter™ from WesTech – the system can also provide tertiary filtration and disinfection ...


    By WesTech Engineering, Inc.

  • An artificial intelligence approach for optimizing pumping in sewer systems

    This paper presents details of a fuzzy logic system developed for the control of sewer pumping stations for energy costs savings. This is part of an ongoing collaborative project between Anglian Water and the University of Sheffield. The model rules and operation are developed for one representative pumping station in order to enable the identification of potential benefits and inhibitors to ...


    By IWA Publishing

  • Bedford Pumps delivers ground breaking technology in deep shaft project

    Bedford Pumps Ltd, in collaboration with Morgan Farrans jv, recently contributed to the success of one of the biggest infrastructure projects in Northern Ireland with the installation of six 15 tonne Storm Water pumps. The pumps, among the largest in Northern Ireland, are a crucial part of Northern Ireland Water’s £160 million Belfast Sewers project, commissioned to overhaul the ...


    By Bedford Pumps Ltd

  • Wastewater master plan - south of Missouri river

    Client: Kansas City, Mo.   Completion Date: 1999   Services Provided Collection system modeling Pumping station analysis Combined and sanitary sewer wet weather flow management Project Summary  Burns & McDonnell performed a master plan of wastewater facilities for Kansas City, ...


    By Burns & McDonnell

  • Mono nov holds the quay

    Mono NOV plays a major part in waste water treatment facilities for Dover Harbour Board. There are more than 18 Mono products installed on the site, ranging from energy saving Mutrators to versatile Merlin pumps and Munchpumps, the combination of an SB Muncher and Mono p.c. pump. A pump from the MD Range was the first Mono pump to be installed on site back in the 1970’s and this pump is still ...

  • Inox in a landfill

    For collection and transport of leachate, landfill sites are using various types of pumps. Grindex electrical corrosion resistant pumps provide the volume needed where pneumatic pumps and other submersibles pumps fall short. One of the landfills in Illinois has 18 Grindex corrosion resistant pumps in operation and they now have plans to replace all remaining submersibles with Grindex INOX pumps. ...


    By Grindex Pumps

  • Allready-Box brings security to production of bioenergy

    Animal feed manufacturer Futtertrocknung Mindelheim eG of southern Germany has been operating a co-generation power station since 2008. During the summer months, this power station uses ecological methods to generate the heat and electricity the company needs to dry soilage. Utilizing a year-round, low-temperature heating network, it supplies local industrial firms and public institutions with ...


    By ALLWEILER GmbH

  • Case study - Topsail Beach, NC - 203 North Anderson Blvd.

    Stored rainwater is used to supply drip irrigation while a dry well system carries rooftop stormwater runoff below a parking area in this residential BRAE design. Project: 203 North Anderson Blvd. Location: Topsail Beach, NC Application: Drip Irrigation System and Stormwater Infiltration System(s): BRAE Complete™ Home ...

  • Performance monitoring & troubleshooting with a new individual condenser tube circulating water flow and fouling (ClA/FF) meter - case study

    Introduction Midwest Generation Joliet Station in Illinois has two coal-fired units, Unit 7 and Unit 8. Roth 550 MW units are located on the Des Plaines River and have been in operation since 1963-1964. The circulating water system is a once-through system comprised of a bar rack, traveling screens, circulating water pumps and reversible condensers. The original condenser tubes on Unit ...


    By Intek, Inc.

  • ‘Smart’ flood alleviation system protects Portsmouth

    In late 2014, Southern Water completed a major project to reduce the risk of sewer flooding in parts of Portsmouth and Southsea. Substantial works were undertaken to divert runoff and tidal ingress, and a ‘smart’ hydrometeorological monitoring system was installed to enable prompt diversion of excess water during periods of high rainfall. Sewer level monitoring is undertaken in ...

  • Maximazing Operational Capacity for Outfall Sewers through Innovative Design

    ABSTRACTThe City of Lincoln, Nebraska has undertaken a strategy to accelerate development of infrastructure systems for critical areas of the community, with the goal of nearly doubling the development rate for those areas. The Little Salt Creek drainage basin is a growing service area which includes over 3,000 acres of developed land and ultimately 5,300 acres in all. The majority of the ...

  • Assessment and improvement planning for the Rochdale South sewerage system

    Rochdale South is a predominantly residential suburb south of the Queensland capital city of Brisbane. It has a total population of 10,680 and a sewerage system catchment area of 580ha. The sewerage system includes five pumping stations which forward sewage flows to a downstream treatment plant. Rochdale South comes under the jurisdiction of Logan City Council, and Logan Water is the body that ...


    By Innovyze

  • Top Water/ Borehole Drilling Companies in Uganda (East Africa)

    Rural water being a source for health, an essential nutrient and a building block for peoples’ lives in local communities cannot be sustained without external support in form of boreholes as they are the ‘surefire’ answer to providing fresh water in rural communities. A borehole is simply a deep-hole or a shaft sunk into the earth purposed ...

  • Springfield refines CSO plan with InfoWorks CS

    With the aid of InfoWorks CS, the Springfield Water and Sewer Commission (SWSC) has been able to find a cost-effective and environmentally-sustainable alternative to a proposed CSO relief project. Springfield is in south-western Massachusetts, New England, and is the area’s major urban center and largest community. The Connecticut River, one of the state’s key waterways, forms its western border. ...


    By Innovyze

  • Salinity modeling for the Altona sewerage strategy

    City West Water’s Altona sewerage system is possibly one of the most studied sewerage networks in Melbourne, Australia. Currently the tertiary sewage effluent from the Altona treatment plant is discharged to Port Philip Bay with an average salinity of approximately 4500 mg/litre.  This study involved the development of a detailed model that accurately reflected the sources and dilution of ...


    By Innovyze

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you