filter test rig Articles

  • Breakthroughs in testing technology as new global player emerges

    Engineers and developers now have a choice of engine testing technologies following the recognition by the United States Federal Register of the BG3 Partial Flow Dilution sampling (PFD) technology developed by Sierra Instruments for engine particulate emissions, R&D and certification. Building on this news, the Monterey, California - based company has also extended its global footprint this ...


    By Sierra Instruments, Inc.

  • On-site water treatment service cuts costs

    After more than two decades in the global oilpatch, Stuart Snydmiller thinks the future for his startup firm is in water, not petroleum. Or at least waste water.Tangent Environmental Technologies, owned with brother Jason and others, has taken existing technologies and put them together into a package that offers huge savings for drilling firms and any industrial operation that needs to process, ...


  • Research papers: safe use of Microbubbles for removal of RO Membrane Fouling - Case Study

    For full downloadable report Abstract The authors have shown a dramatic improvement in cleaning efficiency when effervescent cleaning reagents are used in conjunction with bubbles created using a specially designed microbubble generator. One potential problem associated with this new technique ...

  • Comply with Highly Regulated Oil in Water Measurements Using Portable Infrared Analyzers

    The Petroleum Industry – both offshore and onshore -- has regulations that limit the amount of oil in discharged water.  Fixed filter infrared (IR) analyzers have been used to test oil levels in produced water on drilling platforms for over 45 years for a number of reasons. On oil rigs where real estate is at a premium, infrared analyzers such as the Wilks InfraCal TOG/TPH ...


    By Spectro Scientific

  • J. Erik Jonsson Central Library Dallas, Texas - Case Study

    Key parameters Type of Facility - Existing Function - Public Library (Government) Area - 8 stories, 563,000 sq.ft. Project Completed - 2009 Challenge: Optimize Indoor Air Quality and reduce maintenance costs. The owner wanted clean indoor air to protect the library contents in an urban environment and wanted to replace ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you