  • Guaranteed fixed price remediation of PCE and TCE in soil confidential client, Chicago, IL

    TRS Group, Inc. (TRS) as a subcontractor to Levine Fricke provided a guaranteed fixed price remediation of tetrachloroethene (PCE) and trichloroethene (TCE) in soil using Electrical Resistance Heating (ERH) at a confidential site located in Chicago, Illinois. Unique aspects of this project included using a sheet pile wall as one continuous electrode (120 feet long) and using individual sheet pile ...


    By TRS Group, Inc.

  • Guaranteed fixed price remediation of TCE, PCE and VC in soil and bedrock under an active manufacturing facility confidential client Greensburg, IN

    TRS Group, Inc. (TRS), as a subcontractor to St. John, Mittelhauser and Associates (SMA) provided a guaranteed fixed price remediation of trichloroethene (TCE), tetrachloroethene (PCE) and vinyl chloride (VC) in soil using Electrical Resistance Heating (ERH) at a confidential site located in Greensburg, IN. Unique aspects of this project included: Operation of one ERH system to treat four ...


    By TRS Group, Inc.

  • Guaranteed fixed price PCE remediation – site 22 naval station Great Lakes, Illinois

    TRS Group, Inc. (TRS) worked as a subcontractor to Tetra Tech NUS to remediate PCE-contaminated soil in a tight silt-clay soil matrix. The remedial criteria required all PCE concentrations to be less than 20 mg/kg - a 95.5%reduction of PCE in soil to meet the Illinois EPA Tiered Approach to Corrective Action Objectives (TACO) industrial/ commercial criteria. The remedial goal was surpassed within ...


    By TRS Group, Inc.

  • Remediation: A business perspective

    The key to managing corporate environmental liabilities is to operate the remediation function as a business, recognizing that, like any business, it has a market, customers, and stakeholders. This article explains DuPont's business strategy for managing these liabilities. WHY IS A BUSINESS PERSPECTIVE SO IMPORTANT? Operating like a business is more about being financially disciplined than ...


    By AHC Group

  • An investigation and remediation of TNT contaminated soils.

    An investigation and remediation of TNT contaminated soils and wastes was conducted at the Apache Powder Superfund Site in Cochise County, Arizona during 1999 and 2000. TNT contamination was most likely the result of salvage operations of World War I munitions. Characterized by a steep hillside and arroyo cutting through the wastes, the site offered challenges of stability, access, health and ...


    By Hargis + Associates Inc

  • Sonic making inroads on PCB remediation?

    The Sydney Tar Ponds of Nova Scotia are the result of a century of coal mining and steelmaking, which left behind 900,000 tonnes of chemical waste. About 5 per cent or 45,000 tonnes of this waste is contaminated with high levels of PCBs. Two years ago a federal-provincial plan was announced to clean up the Tar Ponds over 10 years at a cost of $400 million, and this led to the creation of the ...


  • Case study - Petroleum remediation systems

    Overview A major oil company was looking for a way to stay ahead of EPA regulations for soil vapor extraction of BTEX and the subsequent treatment of these gases. They were looking for one company that could offer competitive pricing, local support service, and the application expertise to provide 50 remediation units throughout the ...

  • Eastern Montana - Remediation below operating facility

    Thermal Remediation Services, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene (TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was ...


    By TRS Group, Inc.

  • Site Closure Strategies: Reducing Remediation Liabilities & Costs

    Industrial companies face the daunting task of managing investigations and clean-ups at thousands of contaminated properties. In staying abreast of new technology and ever-evolving regulatory programs, companies must address many challenges involving regulations, technologies, and expenses. To successfully manage the costs and risks for each project, it is important to: 1) Focus on the ultimate ...


    By AECOM

  • GE Leakwise Application Notes: Groundwater Remediation

    The unique capabilities of the Leakwise* Oil on Water Monitoring Systems enable remote measurement of key parameters for: Site assessments Recovery wells and remediation systems ...


    By GE Analytical Instruments

  • Dry cleaner remediation of PCE below operating shopping mall Richmond, Virginia

    TRS Group, Inc. (TRS) was retained by ENSR/AECOM to perform an Electrical Resistance Heating (ERH) remediationof tetrachloroethene (PCE) in groundwater under a former dry cleaner at the Brookhill Shopping Center in Richmond,Virginia. Site assessment activities revealed PCE concentrations would require remediation before an impending property transfer could occur. The standard fixed price ...


    By TRS Group, Inc.

  • Remediation using ERH with sheet pile electrodes confidential client, Indianapolis, IN

    TRS Group, Inc. (TRS) is providing a Standard Fixed Price Remediation (SFPR) of trichloroethene (TCE), tetrachloroethene (PCE) and Vinyl Chloride (VC) in soil and groundwater using Electrical Resistance Heating (ERH) at a confidential site located in Indianapolis, Indiana. Unique aspects of this project included the installation of all electrodes, conveyance piping and wiring below ground. Rapid ...


    By TRS Group, Inc.

  • TCE remediation at an operating railroad fueling facility glendive, Montana

    TRS Group, Inc. (TRS) worked as a subcontractor to Kennedy Jenks Consultants (KJ) to remediate trichloroethene(TCE) in soil during the winter months in Eastern Montana. The project was performed for a firm fixed price based on the TRS standard contract that included installing and operating the ERH system until either the remedial goal was achieved or the design energy was applied, whichever ...


    By TRS Group, Inc.

  • ERH & MPE remediation of DNAPL and LNAPL fort lewis superfund site, Washington

    As the prime contractor, TRS Group, Inc. (TRS) designed and operated Electrical Resistance Heating (ERH) systemsto treat three LNAPL/DNAPL source areas at the Ft. Lewis, East Gate Disposal Yard (EGDY) NPL site. Contaminants ofconcern in NAPL Areas 1, 2 and 3 included chlorinated solvents, primarily trichloroethene (TCE), and POLs (petroleum products, oil and lubricants). Based upon pre- and ...


    By TRS Group, Inc.

  • Southern New Jersey - Guaranteed benzene remediation in soil and groundwater - Case Study

    Project Summary TRS Group, Inc. (TRS) under contract with URS Corporation ( URS) and Resource Environmental, LLC (RELLC) conducted an electrical resistance heating (ERH) remediation of benzene at a former gasoline service station located in southern New Jersey, The project scope of work was contracted as a Guaranteed Fixed Price Remediation (GFPR) that included no rebound of benzene in ...


    By TRS Group, Inc.

  • Newark, CA - Guaranteed PCE and TCE remediation - Case Study

    Guaranteed PCE and TCE Remediation at Hazardous Waste Facility Project Summary TRS Group, Inc. (TRS) completed a Guaranteed Fixed Price Remediation (GFPR) of tetrachloroethene (PCE), trichioroethene (TCE), cis-l,2-dichloroethene (cis 1,2-DCE), 1,1,1-trichloroethane (1,1,1-TCA), 1,1-dichloroethene (1,1-DCE), 1,1-dichloroethane (1,1-DCA), methylene chloride, ...


    By TRS Group, Inc.

  • Remediation of TCE NAPL in active Alleyway Arlington, Texas - Case Study

    Goals to achieve separate analyte-specific clean-up goals in clay soils and groundwater respectively Project Summary TRS Group, Inc. (TRS) completed a Guaranteed Fixed Price Remediation (GFPR) of tetrachioroethene (PCE), trichioroethene (TCE), cis-l,2-dichloroethene (cis 1,2-DCE), 1,1,1-trichloroethane (1,1,1-TCA), 1,1-dichloroethene (1,1-DCE), ...


    By TRS Group, Inc.

  • Remediation of TCE NAPL in active Alleyway Arlington, Texas - Case Study

    Project Summary TRS Group, Inc. (TRS) completed a standard Fixed Price Remediation (SFPR) of trichioroethene (TCE) in soil in Arlington, TX using electrical resistance heating (ERH) in 2012, The system incorporated 19 electrodes with horizontal vapor recovery (VR) wells to treat a soil volume of approximately 4,155 cubic yards (yd3) located between two active buildings. Active ...


    By TRS Group, Inc.

  • TIGG Groundwater Treatment Equipment System Solves Remediation Problems

    When an experienced environmental remediation company secured a contract to clean up a former manufactured gas plant in a New York community, the contractor realized the groundwater environmental remediation process would require a host of different technologies to address contaminated soil as well as ground and surface water.  TIGG was called upon to provide a solution for treating the ...


    By TIGG, LLC

  • Electrical Resistance Heating: a Hot New Approach to Soil and Groundwater Remediation

    Electrical Resistance Heating (ERH) is an aggressive remediation technology that can quickly reduce the mass of volatile organic compounds (VOCs) in soil and groundwater by over 99%. The process is often used to clean sites where other technologies have had limited success. Larger ERH sites are cleaned within 6 to 12 months and smaller sites can be cleaned in half that time or ...


    By TRS Group, Inc.