g3 air filter Articles

  • Universal Input LED Lamps – How do they work?

    In commercial lighting applications with HiD or older 2 pin fluorescent lamps, a magnetic ballast is used to control the energy in the arc lamp. In the first generation of LED replacement lamps, two kinds were available: LED lamps that only worked with the ballast – such as Lunera’s Gen1 & Gen2 Susan families – known by DLC as a “type-A” lamp; LED Lamps ...


    By Lunera Lighting, Inc

  • What are the Top 10 Sustainability Technologies Crucial to Sustain Life on Earth

    Clean and green environment (CGE) technologies have taken center stage with rising water scarcity, energy depletion, and global warming threatening the Earth’s ability to nurture life. A concerted move toward sustainability, especially with regard to water-efficient technologies, is vital for future survival. Recent analysis from Frost & Sullivan,  ...


    By GLOBE Foundation

  • Bacteria-free water - without the use of toxic chemicals - Case Study

    Aarhus University Hospital fought against Legionella bacteria – and won Legionella bacteria thrives in all hot-water supplies and Aarhus University Hospital, Risskov felt the problem firsthand. With the ECA generator from Danish Clean Water A/S they managed to significantly reduce the bacteria and thereby minimizing risks concerning Legionella. Virtually all hospitals, ...


    By Danish Clean Water A/S

  • Chocolate, Candy and Snack Cake Manufacturer - Case Study

    A world renowned sweets manufacturer located just outside the heart of a major city in Mexico, produces sweet marshmallow chocolate-covered products. Faced with space limitations and increased discharge regulations, this processor needed to find a primary wastewater treatment system that would solve their regulatory issues, be expandable for the ever-growing company and fit within a small ...

  • Cancer Care Center of York County Sanford, Maine - Case Study

    Key Parameters Type of Facility – Existing Build (EB) Function – Healthcare Area – 1-story Oncology and Patient Care Building Project Completed – 2007 Challenge: Clean air is important but it is extremely important for oncology patients. When the facility opened in 2006, the center’s ...

  • Office building renovation Ashrae headquarters Atlanta, Georgia - Case Study

    Key Parameters Type of Facility - Existing (EB) Function - Office Building Area - 33,570sf 2-story offices Project Completed - 2008 LEED Platinum Challenge: Sustainable design demonstrating the very latest state-of-the-art heating, ventilation, air conditioning, and refrigeration technology. The first ...

  • Dana-Farber Cancer Institute Boston, MA - Case Study

    Key Parameters Type of Facility – Existing Building Function – Laboratory & Offices Area – 100,000+ sf Project Completed – 2012 LEED Registered - LEED-CI v2009 Challenge: Sustainable design. Dana-Farber Cancer Institute (DFCI) is a principal teaching affiliate of the Harvard Medical ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you