geogrid system Articles

  • Strata Geogrid helps turn unusable land into premium Airport Parking in Seattle, WA

    Challenge Sea-Tac International Airport in Seattle, WA has grown to become the 18th busiest airport in the country and the need for convenient parking is a growing concern. To help provide needed parking, one of the area’s leading parking services, MasterPark Inc., sought to turn unusable land near the airport into a valuable $20-per-night parking lot. Five retaining walls up to 33 ...


    By Strata Systems, Inc.

  • A grid for subgrade stability

    With research to back up quantifiable benefits and recognized design standards, the use of geogrids may be ready for wider acceptance among North American railroads. A product with a 20-year plus track record is rarely referred to as "new." However, this is a label those involved with geogrids find themselves tagged with when it comes to the prod¬uct's use on North American railroads. While ...


    By Tensar International

  • Clemson road bridge case study

    Background The South Carolina Department of Transportation (SCDOT) needed to provide a right-of-way for an access road adjacent to a CSX Railroad line. The proposed Clemson Road Bridge overpass was a challenging project and SCDOT had three choices: Option 1: Construct a 1H:1V Reinforced Soil Slope (RSS) at the northern bridge abutment. Option 2: Lengthen the northern ...


    By Strata Systems, Inc.

  • Ämmässuo landfill, Finland case study

    Opened in 1987, the municipal landfill Ämmässuo in Finland extends over 50 ha, making it one of the largest in all of Scandinavia. Two test fields were set up to find a suitable solution for the surface sealing system and future slope reinforcement The structure of these fields consists of a mineral gas-drain layer, a mineral sealing layer, a geosynthetic clay liner, a protection ...


    By NAUE GmbH & Co.KG

  • Erosion control and slope stability project case study

    The steep un-vegetated slope at this lakeshore residence was eroding into the lake with every rain event. Record high lake levels combined with wave action eroded the base of the hillside causing severe hillside instability. During heavy rainfall events more and more of the hillside slipped into the stairwell and lake. The residence owner was concerned with preserving the slope, overlook ...


    By Envirolok LLC

  • Federal motorway A6 Mannheim-Heilbronn case study

    Stable RiStWag -construction guidelines for roadways in water preservation areas Included in the A6 federal motorway construction project lot Mannheim – Heilbronn/Weinsberg, AS Bad Rappenau – AS Neckarsulm is the widening of km 631+640 and km 641+060 to six lanes. This section is runs through a water preservation zone, type IIIa, protected under RiStWag. Because of this, a ...


    By NAUE GmbH & Co.KG

  • Case Study - Steep slope erosion control (Bijao Beach Resort,Santa Clara, Panama)

    Background: The Bijao Beach Resort community resides in the balmy region of Panama near Santa Clara’s beaches. It was constructed as a luxury resort to compete with nearby Playa Blanca and Decameron. An artificial mountain was created to enhance the geography of the resort. Native soil of the area was compacted and stabilized with biaxial geogrid, but rain has wreaked havoc upon ...


  • Steep Slope Erosion Control (Bijao Beach Resort,Santa Clara, Panama) case study

    Background: The Bijao Beach Resort community resides in the balmy region of Panama near Santa Clara’s beaches. It was constructed as a luxury resort to compete with nearby Playa Blanca and Decameron. An artificial mountain was created to enhance the geography of the resort. Native soil of the area was compacted and stabilized with biaxial geogrid, but rain has wreaked havoc upon the ...

  • Pace properties case study

    Background Available property for development within the Interstate 285 perimeter in Atlanta is becoming increasingly scarce. A northwest portion of metropolitan Atlanta was becoming progressively more congested and sites previously considered too expensive or difficult to build upon were being targeted for development. The owners wanted to develop this site for a motel/suites ...


    By Strata Systems, Inc.

  • Case study - Topsail Beach, NC - 203 North Anderson Blvd.

    Stored rainwater is used to supply drip irrigation while a dry well system carries rooftop stormwater runoff below a parking area in this residential BRAE design. Project: 203 North Anderson Blvd. Location: Topsail Beach, NC Application: Drip Irrigation System and Stormwater Infiltration System(s): BRAE Complete™ Home ...

  • Former MGP Site Required a Sediment Treatment and Erosion Protection Solution

    A shoreline revetment and sediment capping project along the Collins Cove coast of Beverly, Massachusetts required an erosion solution. The Challenge: Trying to maintain a system that will prevent loss of soils in a dynamic coastal environment is always challenging. As in most erosion control applications the revetment is intended to protect the underlying geotextile. In this particular ...


    By CETCO

  • Former MGP site required a sediment treatment & erosion protection solution case study

    Project: Collins Cove Shoreline Revetment & Sediment Cap Location: Beverly, MA Products: Organoclay Reactive Core Mat Triton Marine Mattresses by Tensar Background: The project is situated on a former manufactured gas plant (MGP) site located along the Collins Cove coast of Beverly, MA. ...


    By CETCO

  • How Strata’s Microgrid reinforced a roadside slope and saved 30-percent in costs

    Challenge The City of Fairfield in Solano County, CA has many beautiful parks and trails enjoyed by residents year round. One of roadways stretching alongside one of these natural areas was threatened due to unstable soils and a failing slope. This posed safety concerns for the area. The roadway had a right of way to a state highway and the county and city were in need of a cost effective ...


    By Strata Systems, Inc.

  • Oil & Gas exploration access road (Orito - Putumayo, Colombia) case study

    Background: Ecopetrol, one of the principal petroleum companies in latin america, has been expanding its reach deeper into the forests of Colombia. Drilling exploratory wells in remote locations such as the Putumayo basin concurs with a very aggressive growth strategy. The area around Orito is an extremely dense, undulating forest with poor soils and wet subgrades, nearly impossible to drive ...

  • Oil & gas exploration access road (Orito - Putumayo, Colombia)

    Background: Ecopetrol, one of the principal petroleum companies in latin america, has been expanding its reach deeper into the forests of Colombia. Drilling exploratory wells in remote locations such as the Putumayo basin concurs with a very aggressive growth strategy. The area around Orito is an extremely dense, undulating forest with poor soils and wet subgrades, nearly impossible to ...


  • Reinforced Soil within a Retaining wall provides solution for a factory site in Goa

    In order to ensure stability, Maccaferri India installs the MacRES Reinforced Soil (RS) wall system with concrete panel fascia and ParaWeb soil reinforcement into the Goa Industrial Construction site. Watson Pharma Pvt. Ltd. a global pharmaceutical company proposed to build a full fledged manufacturing unit at Verna, Goa. Verna Industrial Estate is located approximately 10 km north of the South ...


    By Officine Maccaferri S.p.A.

  • Road Over Sensitive Groundwater Areas - Case Study

    When constructing or extending new roads, the responsible designers and contractors are increasingly faced with the task of preventing soil contamination. Therefore, measures for the protection of the groundwater are necessary in more and more cases. The corresponding requirements and specifications for such measurements are regulated in the "guide-line for constructional measurements of roads in ...


    By NAUE GmbH & Co.KG

  • Donzi landfill expansion using stratagrid case study

    Background The Donzi Lane Landfill in Atlanta, GA had been in use since the 1970's for construction and demolition waste disposal. The site was nearing its capacity and additional landfill space was urgently needed due to the accelerating population growth and waste stream generated by development. Due to the high cost and long lead times for designing, permitting and constructing new ...


    By Strata Systems, Inc.

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you